Hwy. 367 – Hwy. 365 (S) — Pulaski County | 338 | PM.
Route(s): 338.
Letting November 4, 2026 (bids due 10:00 AM).
ARKANSAS DEPARTMENT OF TRANSPORTATION
A60066
HWY. 367 – HWY. 365 (S)
FEDERAL AID PROJECT STPLC-0060(83)
THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 5.078 MILES OF HIGHWAY 338 IN PULASKI
COUNTY. THIS PROJECT CONSISTS OF EARTHWORK, AGGREGATE BASE COURSE, HIMOD ASPHALT SURFACE COURSE,
ACHM SURFACE COURSE, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY,
MAINTENANCE OF TRAFFIC, RADAR DETECTION SYSTEM, PAVEMENT MARKING, AND MISC. ITEMS.
ROUTES: 338
SECTIONS: 2
COUNTY: PULASKI
LENGTH: 5.078 miles in length.
THE FOLLOWING ITEMS AND APPROXIMATE QUANTITIES ARE INVOLVED:
210702 SOIL STABILIZATION 5,177.00 TON
303117 AGGR.BASE COURSE(CLASS 7) 718.00 TON
401011 TACK COAT 9,552.00 GAL
407153 MA IN HIMOD SURF (1/2") 2,235.00 TON
407162 MA IN ACHM SURFACE(1/2") 10,362.00 TON
407452 AB(PG76-22)ACHM SURF(1/2") 626.00 TON
407455 AB IN HIMOD SURF (1/2") 143.00 TON
412002 COLD MILLING ASPHALT PVMT. 94,665.00 SQYD
414011 ASPH.CONC.PATCH-MAINT. 127.00 TON
415011 ACHM PATCH.EXIST.RDWY. 250.00 TON
601001 MOBILIZATION 1.00 L.S.
603010 MAINTENANCE OF TRAFFIC 1.00 L.S.
604003 SIGNS 760.00 SQFT
604023 TRAFFIC DRUMS 211.00 EACH
604041 CONST.PAVEMENT MARKINGS 107,247.00 LF
635011 ROADWAY CONSTRUCTION CONTROL 1.00 L.S.
The work includes soil stabilization, aggregate base course placement, tack coat application, HIMOD and ACHM asphalt surface courses, cold milling of asphalt pavement, asphalt concrete patching, mobilization, maintenance of traffic, signage, traffic drums, pavement markings (including thermoplastic and raised markers), a portable traffic signal system, roadway construction control, and installation of a radar detection system with associated cabinet and video cable components.
We post new asphalt opportunities in Arkansas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Arkansas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Arkansas Department of Transportation (solicitation A60066), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.