Hwy. 8 – South (S) — Polk County | 375 | AM.
Route(s): 375.
Letting November 4, 2026 (bids due 10:00 AM).
ARKANSAS DEPARTMENT OF TRANSPORTATION
A40062
HWY. 8 – SOUTH (S)
FEDERAL AID PROJECT STPSC-0057(35)
THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 11.620 MILES OF HIGHWAY 375 IN POLK COUNTY. THIS
PROJECT CONSISTS OF TRENCHING AND SHOULDER PREPARATION, ACHM BINDER AND SURFACE COURSES, COLD
MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE OF TRAFFIC, EROSION
CONTROL, PAVEMENT MARKING, AND MISC. ITEMS.
ROUTES: 375
SECTIONS: 1
COUNTY: POLK
LENGTH: 11.62 miles in length.
THE FOLLOWING ITEMS AND APPROXIMATE QUANTITIES ARE INVOLVED:
215011 TRENCH.AND SHOULDER PREP. 227.00 STA
303117 AGGR.BASE COURSE(CLASS 7) 2,704.00 TON
401011 TACK COAT 19,298.00 GAL
406161 M.A. IN ACHM BINDER(1") 2,238.00 TON
406412 A.B.(PG70-22)ACHM BINDER(1") 115.00 TON
407162 MA IN ACHM SURFACE(1/2") 23,875.00 TON
407442 AB(PG70-22)ACHM SURF(1/2") 1,470.00 TON
412002 COLD MILLING ASPHALT PVMT. 2,388.00 SQYD
414011 ASPH.CONC.PATCH-MAINT. 300.00 TON
415011 ACHM PATCH.EXIST.RDWY. 1,000.00 TON
601001 MOBILIZATION 1.00 L.S.
603009 MAINTENANCE OF TRAFFIC 1.00 L.S.
604003 SIGNS 901.00 SQFT
604041 CONST.PAVEMENT MARKINGS 250,000.00 LF
621031 SAND BAG DITCH CHECKS 475.00 BAG
621169 FILTER SOCK (18") 500.00 LF
635011 ROADWAY CONSTRUCTION CONTROL 1.00 L.S.
637001 MAILBOXES 25.00 EACH
637017 MAILBOX SUPPORTS (SINGLE) 25.00 EACH
718002 REFL.PAINT PVMT.MRK.WH(6") 123,000.00 LF
718006 REFL.PAINT PVMT.MRK.WH(24") 30.00 LF
718102 REFL.PAINT PVMT.MRK.YL(6") 123,000.00 LF
721002 RAISED PAVEMENT MARKERS-2 770.00 EACH
THE SUCCESSFUL BIDDER WILL BE REQUIRED TO COMPLETE THIS CONTRACT ON OR BEFORE November 24, 2027.
The project consists of trenching and shoulder preparation, aggregate base course, tack coat, ACHM binder and surface courses (including maintenance asphalt and PG70-22 mixes), cold milling asphalt pavement, asphalt concrete patching (maintenance and existing roadway), mobilization, maintenance of traffic, signs, construction pavement markings, sand bag ditch checks, filter socks, roadway construction control, mailboxes and mailbox supports, reflective paint pavement markings (white and yellow, 6" and 24"), and raised pavement markers.
We post new asphalt opportunities in Arkansas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Arkansas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Arkansas Department of Transportation (solicitation A40062), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.