AMENDMENT 1, 5 Oct 2026
The following documents have been uploaded and must be reviewed before making a quotation:
CSS FA813226Q0058 - Furnace Interface Upgrade - Amendment 1
Attachment 1 - Performance Work Statement (PWS), Revised 2 Oct 2026
Attachment 2 - Appendix A (Equipment List)
Attachment 3 - Appendix C (Safety)
Attachment 4 - OC-ALC Operating Instruction 21-103 (referred to in the PWS in section 1.15, 1.16, 1.17)
Attachment 5 - Questions & Answers
Furnace Interface Upgrade - See Attachment 1, Performance Work Statement, for complete requirement and specification details.
The contractor shall provide all labor, tools, equipment, test equipment, material, parts, quality control, transportation and inspection manuals necessary to perform the one-time Upgrade Furnace Interface on the Furnace Vacuum #45 2-Bar Horizontal Front-Loading (Heat Treat) at the Oklahoma City–Air Logistics Complex (OC-ALC) and off base at the contractor’s facility. The customer shall supply and ship the computer hardware and display monitor to the contractor for configuration and software installation. The contractor shall purchase and register one software license: Wonderware InTouch 2023 R2 Wrkst 5kTag/750 Win w/ I/O. The contractor shall perform all in-house software installation and configuration on the provided hardware, return the hardware to the customer, perform on-site installation into the existing cabinet, integrate the Wonderware license with the furnace, and demonstrate that the upgraded interface meets or exceeds the requirements, including security, furnace graphics, process overview, process programming, alarms, and history. The contractor shall be present for the entirety of acceptance testing, and successful demonstration of all events and routines is required for acceptance.
We post new it & software opportunities in Oklahoma as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"73145-3303""TINKER AFB""OK""USA""STE 1AC1 98C CP 405 739 5732""3001 STAFF DR STE 1AC1 98C""CSS FA813226Q0058 - Furnace Interface Upgrade - Amendment 1.pdf"305085"file"".pdf""1""2026-10-05T20:57:40.465+00:00""84218ccccbe94e8489514ebe193d24f5""public""0""public""97388075ef244a358fa88744833a7743""0"13"0""Attachment 1 - Performance Work Statement - Upgrade Furnace Interface - Revised 2 Oct 2026.pdf"366990"file"".pdf""1""2026-10-05T20:57:40.465+00:00""cbe3c8b3b379428a90627278fe064313""public""0""public""58dded1055cf40c59ace80fdda75d88a""0"11"0""Attachment 2 - Furnace Interface Upgrade - Appendix A - Equipment List_Redacted.pdf"142087"file"".pdf""1""2026-10-05T20:57:40.465+00:00""ad7154fa544b4e75b15c8c6c744d5d43""public""0""public""d4bd09a19e714bf2bd07b91f2fca7f67""0"9"0""Attachment 3 - Furnace Interface Upgrade - Appendix C - Contract Safety.pdf"198551"file"".pdf""1""2026-10-05T20:57:40.465+00:00""57a3f9680cc242268b3ae47b60e407ab""public""0""public""a32128ca973c46c0b9cd6843e23b4b3a""0"7"0""Attachment 4 - OC-ALC Operating Instruction 21-103.pdf"1287954"file"".pdf""1""2026-10-05T20:57:40.465+00:00""90217dc358fc40d7b30438363aa6f626""public""0""public""e04300d78cb440ac9a271c323330a3a8""0"6"0""Attachment 5 - Questions and Answers.pdf"100921"file"".pdf""1""2026-10-05T20:57:40.465+00:00""a1780c3b783b4f25935c64498e51b3f4""public""0""public""0c7c9f620c924e128d81ca3cac749879""0"5"0""CSS FA813226Q0058 - Upgrade Furnace Interface.pdf"303668"file"".pdf""1""2026-09-29T17:30:45.374+00:00""9c0bca2320a84673a257348d45c92a50""public""2026-10-05T20:57:40.465+00:00""1""public""0798ddbb1adf44eeacb42f3b853271b1""0"4"0""2026-10-05T20:57:40.465+00:00""Attachment 1 - Performance Work Statement - Upgrade Furnace Interface.pdf"2143774"file"".pdf""1""2026-09-29T17:30:45.374+00:00""4d6b1f77430e4423ab6b82923f0298a9""public""2026-10-05T20:57:40.465+00:00""1""public""ae77b4004ca444be8e6c84a26b982995""0"3"0""2026-10-05T20:57:40.465+00:00"Most Oklahoma work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 9f7756c72c9b455ab9e2972d8343cb32), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.