We post new roofing opportunities in Washington as agencies publish them. Get them in one email — free, and unsubscribe whenever.
The Contractor shall provide all personnel, materials, labor, equipment and supervision to complete the roof replacement on the Cooperative Program Manager (CPM) building located at Gray, ME as per the Statement of Work (SOW).
The contractor shall remove all existing flashing materials, install approximately 400 sq ft of 1.5-inch isocyanurate insulation board over the existing roof membrane, and install approximately 400 sq ft of new 60-mil EPDM synthetic rubber membrane. The work also includes installing approximately 80 ft of new edge metal around the perimeter, providing a 20-year manufacturer's warranty, and performing all associated tasks such as rough carpentry, flashing, and sealant work. The contractor must provide all labor, materials, equipment, disposal, and incidentals, and comply with Davis-Bacon wage determinations and OSHA safety standards.
"US""US""98115""SEATTLE""WA""USA""WESTERN ACQUISITION DIVISION""7600 SAND POINT WAY NE BLDG 1,""Sol_1305M326Q0395.pdf"451841"file"".pdf""1""2026-08-03T21:52:45.682+00:00""d12262e83ddb4b3e9924d4eb920f30a4""public""0""public""accb1341d6074313ad728273313d526c""0"3"0""142010-26-0142_Attachment_1_Site_Photos.pdf"680134"file"".pdf""1""2026-08-03T21:52:45.682+00:00""c19e7c39b605467097727818d2cdd973""public""0""public""795e5a3713fa47e0a115b592c47d4d59""0"2"0""1305M326Q0395_Attachment_2_General_Decision.pdf"51984"file"".pdf""1""2026-08-03T21:52:45.682+00:00""f4209e17427746adb1a8261387c5ddc3""public""0""public""def1d2a0a44f44608dea1b81c6d2998e""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice 9e62954e1e7e4affbda370bfab51672f), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.