We post new structural work opportunities in South Carolina as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Perform a comprehensive demolition, removal, and site restoration services at the two (2) specified locations: the Olanta Site and the Kingstree Site. The contractor shall provide all necessary labor, supervision, materials, and equipment to perform the tasks outlined below. All work shall be executed in a safe and professional manner, with debris disposed of in accordance with all local, state, and federal regulations and in accordance with the Statement of Work.
The contractor shall demolish all existing structures at both sites, including lightning towers, concrete footings, slabs, fencing, and electrical services. At the Olanta Site, work includes removing 570 cubic yards of aggregate base, placing 570 cubic yards of topsoil, removing 600 linear feet of chain-link fence, 3,200 linear feet of t-post and barbed wire fence, two lightning towers, two concrete tower footings, one housekeeping slab, 350 linear feet of underground electric service, electrical service racks and pole, approximately 23 ground rods, and 1,000 linear feet of ground ring, followed by hydroseeding 3,500 square yards. At the Kingstree Site, work includes removing 600 linear feet of chain-link fence, 2,100 linear feet of t-post and barbed wire fence, two lightning towers, two concrete tower footings, one housekeeping slab, 350 linear feet of underground electric service, electrical service racks and pole, approximately 23 ground rods, and 1,000 linear feet of ground ring, then placing 200 cubic yards of topsoil and hydroseeding approximately 1,200 square yards. The contractor must also video all work areas prior to starting, comply with all applicable codes and standards, and submit daily reports and dump receipts.
"29152-5125""SHAW AFB""SC""USA""CP 803 895 5403""321 CULLEN ST BLDG 216""WD 2015-4439 Rev 29 - 13 May 26.pdf"39469"file"".pdf""1""2026-08-04T19:28:41.763+00:00""526bf8629d3843cdbc7cd34f40af368e""public""0""public""be20ec8a2d0348678c27b019264a1cbc""0"6"0""DD Form 1354 - AUG 2022.pdf"146643"file"".pdf""1""2026-08-04T19:28:41.763+00:00""37d1da3d0b2e4c93acdfdd75a2ab55e0""public""0""public""f486f04dc88a4d0e8dcba29ca2edfd08""0"5"0""AF form 66 Blank.pdf"155759"file"".pdf""1""2026-08-04T19:28:41.763+00:00""43a4f66f44954c7792c7b896df3e0f93""public""0""public""4e367a97c01d499fadbaad4b453d1d1d""0"4"0""2023_SOW Template_Contract Environmental Provisions_FINAL.docx.pdf"491496"file"".pdf""1""2026-08-04T19:28:41.763+00:00""b81a343180c04fd28fa810fa2e6d0dfd""public""0""public""e958d1cf016645858bd3682955676228""0"3"0""01 SOW VLSB 26-0072 Demo Minimute Sites 08_03_26.pdf"136704"file"".pdf""1""2026-08-04T19:28:41.763+00:00""d6e68f0f8add47f49131eda18b328275""public""0""public""d8a8f39ed17a4f5e9a2efe523132527a""0"2"0""Solicitation - FA480326Q0094.pdf"607831"file"".pdf""1""2026-08-04T19:28:41.763+00:00""9cf46706f5fe4457a54632a4c3fa0b54""public""0""public""0b7b752ba10c41df86804dcbc4c0dcb0""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice 9dfb8d1b48274ad897e12fd49b4ee7ca), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.