Princeton Plasma Physics Laboratory is looking to acquires
PPPL personnel perform much of the routine required inspections; however, during peak workload periods and for large repairs, the Subcontractor may be called upon on to perform these tasks. This SOW provides the requirements for subcontracted periodic inspections. It also addresses the assignment to a Subcontractor of the requirement to perform remedial (corrective) maintenance, which may be determined necessary based upon the periodic inspections, in order to make a piece of equipment operable in accordance with governing codes and standards, and the performance of routine maintenance as recommended by the various equipment manufacturers. Unless specified and agreed to otherwise in writing, PPPL requires that the work be performed in accordance with the manufacturer specifications and procedures. After any maintenance is performed, a complete thorough check of equipment function shall be performed including all safety features and interlocks as described by the manufacturer. Additionally, the Subcontractor may be called upon for advice for crane upgrades and performance enhancements. Several large cranes (Items 3, 13, 33, 34 on Attachment A) are retrofitted with Catron/Electromotive radio remote controls and Variable Frequency Drives. Familiarity with and qualification in maintenance and adjustments of these cranes and control systems is mandatory. Subcontractor's membership in the Crane Manufacturers Association of America (CMAA) is regarded as highly desirable, and a measure of the Subcontractor's professionalism and technical qualification for performing tasks such as assigned under the Statement of Work.PPPL does not guarantee any minimum level of work and reserves the right to use other sources to perform the inspection and maintenance tasks when PPPL determines this to be appropriate
A mandatory preproposal zoom meeting has been scheduled for 1:30 PM on 8 Oct 2026. Zoom invitations will only be sent to firms completing and submitting an RFP acknowledgement form
The subcontractor will perform periodic inspections, remedial (corrective) maintenance, and routine maintenance on hoisting and rigging equipment at PPPL. Work includes inspections, maintenance, and repairs in accordance with manufacturer specifications and procedures. The subcontractor may also be called upon for advice on crane upgrades and performance enhancements. Several large cranes are retrofitted with Catron/Electromotive radio remote controls and Variable Frequency Drives, and familiarity with these systems is mandatory.
We post new equipment maintenance & rental opportunities in New Jersey as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"Richland""WA""US""2345 Stevens Drive""08540""Princeton""NJ""USA""100 Stellarator Rd.""Section V SCA Wage Determination.pdf"353313"file"".pdf""1""2026-09-30T20:10:11.672+00:00""7f3fb34d5f4448da849e70af844e4a00""public""0""public""3e13753e85074ffa9b3dfac0b7bc1116""0"12"0""Section I - SOW_Hoisting and Rigging Services.pdf"7064852"file"".pdf""1""2026-09-30T20:10:11.672+00:00""642a6ac46fb64713a54557c79082c502""public""0""public""db3d2b1a215f413b9df113715c2e4c14""0"11"0""Section V - Forms_PPPLRepsCerts_2025.pdf"341752"file"".pdf""1""2026-09-30T20:10:11.672+00:00""24c75e37d92445e380639adad095b64a""public""0""public""f619c96e652e45aeadb5ca4260d0f1a2""0"10"0""Section IV - RFP 26-081JR Evaluation and Basis for Award.pdf.pdf"163881"file"".pdf""1""2026-09-30T20:10:11.672+00:00""35e2ce2c7e7c4327b8a62b8db3f54933""public""0""public""bddce182bdf940bea08c59c5796b951e""0"9"0""Section V - Forms_E-Verify Certification Document.pdf"111245"file"".pdf""1""2026-09-30T20:10:11.672+00:00""899ef3068dd04f8d97010398f45cac26""public""0""public""f82fb2df8e1a48a3b8e8bb2f8618fff6""0"8"0""Section III - RFP 26-081JR Instructions.pdf"226500"file"".pdf""1""2026-09-30T20:10:11.672+00:00""661e0fbc55134ab48088b54488242c92""public""0""public""c80e7bc7a8444adc899d90316d84e086""0"7"0""Section II - RFP 26-081JR Sample Subcontract.pdf"168617"file"".pdf""1""2026-09-30T20:10:11.672+00:00""f7a2331d1e5a49b9b206f8225dbe7c76""public""0""public""f9b4ea85c7e6481eb3cea19a233cf9f6""0"6"0""PPPL-PD-T Provisions For Work Performed On The PPPL Site-Rev 6_Jun2026x.pdf"672144"file"".pdf""1""2026-09-30T20:10:11.672+00:00""ca6c45d20e07468a9afbb7eabc94d534""public""0""public""81127397471a4776938cf02201ace9fc""0"5"0""PPPL-PD-CTC (Commercial) Rev 26_Feb2024.pdf"235255"file"".pdf""1""2026-09-30T20:10:11.672+00:00""3389732d67db4b5382838f77aea16786""public""0""public""4abc082a95e04ddba6f87e95ba334cae""0"4"0""RFP 26-081JR Table of Contents.pdf"113129"file"".pdf""1""2026-09-30T20:10:11.672+00:00""8e8f2fa19e6948bf85b0ae6984d81e3a""public""0""public""8b3660ce339946c2b86ae12c5e32875e""0"3"0""PPPL-PD-S (Service Contract Labor Standards)- Rev 8_Sept2022.pdf"172706"file"".pdf""1""2026-09-30T20:10:11.672+00:00""4c21fa0887724838ad589b6d3c06ce4e""public""0""public""abf7eaaceb6d4c86a0630fdc9fc2298f""0"2"0""PPPL-PD-F (TM) Rev 10_Feb2024.pdf"157308"file"".pdf""1""2026-09-30T20:10:11.672+00:00""51a65a9abe294c688c3265105450bcbc""public""0""public""19c835105bbc40fa8215085ab5ac9757""0"1"0"Most New Jersey work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 95542cb37c5f4ae489bf069ff8916b45), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.