This scope of work requires the contractor to locate, inspect, and modify an unmapped 700 to 800 foot concrete-encased four inch cast iron sewer line and its associated distribution box, with mandatory Government presence during all site inspections. Key tasks include installing concrete-encased Schedule 40 PVC double-Y clean-outs every 300 feet, exposing and inspecting the distribution box and its 2009 leach field connections, and extending the box cover using a riser and structural cover rated for three ton vehicle traffic protected by four concrete-encased steel safety-yellow bollards. All physical, material, and dimensional adjustments must be documented as Red Line As-Builts on the reference drawing, and any recommended corrective actions for the lateral lines must be delivered via a detailed findings report with comprehensive labor and material cost estimates.
The contractor must locate, inspect, and modify an unmapped 700 to 800 foot concrete-encased four inch cast iron sewer line and its associated distribution box, with mandatory Government presence during all site inspections. Key tasks include installing concrete-encased Schedule 40 PVC double-Y clean-outs every 300 feet, exposing and inspecting the distribution box and its 2009 leach field connections, and extending the box cover using a riser and structural cover rated for three ton vehicle traffic protected by four concrete-encased steel safety-yellow bollards. All physical, material, and dimensional adjustments must be documented as Red Line As-Builts on the reference drawing, and any recommended corrective actions for the lateral lines must be delivered via a detailed findings report with comprehensive labor and material cost estimates.
We post new plumbing opportunities as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"74137-4290""TULSA""OK""USA""KO CONTRACTING DIVISION""2488 E 81ST STREET""https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912BV26QA069¬iceType=SolicitationNotice"0"link""1""2026-06-24T21:39:31.458+00:00""a392c36faa504bbd97fd868483b5d3a7""public""0""PIEE Solicitation Module Link for W912BV26QA069""public""dfd30b3f7dba4a59bfba889f7d5476c5""0"4"0""https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml"0"link""1""2026-06-24T21:39:31.458+00:00""0d6f5042f4234a8f97c091c834d5fbca""public""0""Web Based Training for the PIEE Solicitation Module""public""0a9ac97fe910412ea26598d30a40e2e9""0"3"0""https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf"0"link""1""2026-06-24T21:39:31.458+00:00""57130097709141c7b71c80d6e934e5e0""public""0""Registration Instructions for the PIEE Solicitation Module""public""504ba3cfb5c84610b902ac3a22a3f5f2""0"2"0""https://dodprocurementtoolbox.com/"0"link""1""2026-06-24T21:39:31.458+00:00""9c6c79a6774a436ea1fc83594b493193""public""0""Department of Defense Procurement Toolbox""public""e762dc8e49224d4a9b0319a55bbf0fda""0"1"0"Most public work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 8e92004d969d4ab59e9ce1976905300d), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.