We post new concrete opportunities in Maryland as agencies publish them. Get them in one email — free, and unsubscribe whenever.
This is a combined synopsis/solicitation for the National Institute of Standards and Technology (NIST) Granite Paver Maintenance and Repair requirement as described in the attached Statement of Work (SOW). Please see attached combined synopsis/solicitation, Statement of Work (SOW), Wage Determination, NIST Guidelines for Contractors and A/E Firms, Revolutionary FAR Overhaul (RFO) Provisions and Clauses, and Granite Paver Unit Pricing Schedule.
NIST intends to conduct a Site Visit for this requirement on 8/13/2026 at 10AM. Please see instructions in the combined synopsis/solicitation. Those planning on attending must notify NIST of your intention and provide the information detailed in the attached synopsis/solicitation by no later than Wednesday, 8/12/2026.
The contractor shall provide all materials and labor necessary to complete repairs, maintenance, renovations, and alterations to existing granite pavers at the NIST Building 101 Main Entrance and Side Entrance, and additional repairs to granite paver systems located at the NIST Gaithersburg Campus. The work includes restoring settled paver systems, deteriorated mortar beds, and cracked individual pavers that create trip hazards.
"US""US""20899""GAITHERSBURG""MD""USA""ACQUISITION MANAGEMENT DIVISION""100 BUREAU DR.""Attachment E - RFO Clauses.pdf"801308"file"".pdf""1""2026-08-07T20:20:19.989+00:00""ca93deae9bd9479f92dff692ad12587f""public""0""public""e88589ad90834f88a031e94fe2408ccf""0"7"0""Attachment C - Guidelines for Contractors and A-E firms.pdf"411886"file"".pdf""1""2026-08-07T20:20:19.989+00:00""424ea2f68f7240978416897420bc2ba9""public""0""public""976d088a6d3a4381a1ddf91d857366ba""0"6"0""Attachment D - RFO Provisions.pdf"345395"file"".pdf""1""2026-08-07T20:20:19.989+00:00""040c109239694f6eaeeda2aa233d6b15""public""0""public""6c5302e8e3464a8280e7ec92e2ed8136""0"5"0""Attachment A - Statement of Work.pdf"158728"file"".pdf""1""2026-08-07T20:20:19.989+00:00""fcefe574cfcd4ae18c0efca3a055b8d1""public""0""public""cd6b87814c79450ab56fd5b4b9b376e1""0"4"0""Attachment F - Granite Paver Unit Pricing Schedule.xlsx"9485"file"".xlsx""1""2026-08-07T20:20:19.989+00:00""644f9fc8a50e4caeba45e2c03225ea02""public""0""public""c2ea4b9f0291423a8d3d06467e2abccf""0"3"0""Attachment B - Wage Determination.pdf"64381"file"".pdf""1""2026-08-07T20:20:19.989+00:00""a009bf83233d42fc86e75c249e8b1f1e""public""0""public""dc513de257be448f8cc12db60aa135b8""0"2"0""Combined Synopsis Solicitation - Granite Paver Maintenance and Repair.pdf"302384"file"".pdf""1""2026-08-07T20:20:19.989+00:00""5e0ba93cec8c4d019baca26af21f6157""public""0""public""ce0dfb0a98464daca13a50046eaa8e0d""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice 8d9327981e5e41c39f15f98ee11806b0), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.