We post new uncategorized opportunities in Washington, DC as agencies publish them. Get them in one email — free, and unsubscribe whenever.
The objective of the Audit is to inform US Capitol Power Plant (CPP) management regarding the current conditions and operational practices within the utility tunnels in terms of safety and health compliance to local, state, and federal regulations. The Audit shall identify and document all current areas of non-compliance. Findings shall address condition changes as related to past reports, new deterioration or safety concerns, and the probable cause. The report shall also identify if there is a potential for tunnel or pipe failure or other imminent concerns. The report shall also address noted changes in the condition of the tunnel as it relates to past reports or audits, including but not limited to the acceleration of concrete spalling de-laminations, cracks, damages to pipe insulation, and conditions of electrical conduits. The Audit Report shall contain digital photograph(s). Health and Safety Audits shall be completed under the direction of a Certified Industrial Hygienist and/or Safety Specialist, and Mechanical and Electrical Engineer(s).
In addition to the Primary NAICS Code 541330, the AOC is also accepting the following:
541620 – Environmental Consulting Services (industrial hygiene, asbestos/lead/mold assessment)
541380 – Testing Laboratories and Services (air quality, noise/PEL testing)
541350 – Building Inspection Services (egress, ladders, hatches, code compliance)
The contractor must audit the current conditions and operational practices within the utility tunnels of the US Capitol Power Plant (CPP) for safety and health compliance with local, state, and federal regulations. The audit shall identify and document all areas of non-compliance, address condition changes relative to past reports, new deterioration or safety concerns, and probable cause. The report must also identify potential for tunnel or pipe failure or other imminent concerns, and address changes in tunnel condition including concrete spalling, de-laminations, cracks, pipe insulation damage, and electrical conduit conditions. The audit report shall contain digital photographs. The work must be completed under the direction of a Certified Industrial Hygienist and/or Safety Specialist, and Mechanical and Electrical Engineer(s).
"20515""Washington""DC""USA""2nd & D Streets, SW""FHOB - Room 264""AOCACB26R0033 - 01.pdf"210767"file"".pdf""1""2026-06-08T14:03:01.879+00:00""22da9be2ba504b598a89e303b38df811""private""0""controlled""f82166378c614379bde0aacd8035cce1""1"17"0""AOCACB26R0033 - 02.pdf"274455"file"".pdf""1""2026-06-18T16:12:20.336+00:00""7b2287566c9f41369d624b6a62187f10""public""0""public""ec0ba2e2d8814a3e9ceea93426669073""0"13"0""AOCACB26R0033 (03).pdf"284649"file"".pdf""1""2026-08-04T18:52:32.442+00:00""9d180ea0ae834e1ebc7226303f130ba3""private""0""controlled""6563c2c2a81343f2b12313afda985236""1"12"0""Attach 7 - Sample Certificate of Insurance (COI) 2022.pdf"3123723"file"".pdf""1""2026-06-05T14:35:46.67+00:00""3c80304880c742188202bf4ea0538710""private""0""controlled""2f9962ad34824cf9b403f57785ab9485""1"11"0""Attach 4 - CUI Order 42-4 Security of Controlled Unclassified Information.pdf"1141737"file"".pdf""1""2026-06-05T14:35:46.67+00:00""4393f8fdeccd4beb8dbf972b89df43ba""private""0""controlled""00565a8201ad47e284340a142a83b8fe""1"10"0""Attach 6 - USCP ID Request.pdf"934196"file"".pdf""1""2026-06-05T14:35:46.67+00:00""513b43c59bfc40a3af64997118334dac""private""0""controlled""d48da7c1ccd5445a94bad74177dd76c5""1"9"0""Attach 3 - AOC Order 37-1 Preservation Policy and Standards 2025.pdf"433244"file"".pdf""1""2026-06-05T14:35:46.67+00:00""a54b5c3d4b7947618b3f4042cb1b662a""private""0""controlled""126e38558e5b400abda443bd5705dd15""1"8"0""Attach 1 - CPP UDS Annual HS Audits 2026-2030 SOW Updated.pdf"286163"file"".pdf""1""2026-06-05T14:35:46.67+00:00""6673a5dec7b144da82dcab81b93c91e9""private""0""controlled""27dc71cddd994a689e4a3d7aa2f2a423""1"7"0""Attach 8 - Section L - Instructions to Offeror.pdf"195284"file"".pdf""1""2026-06-05T14:35:46.67+00:00""b51c57f78772435ebf33b8f72165c1c0""private""0""controlled""12c49247b19942d1bd39cac7ab46382b""1"6"0""Attach 9 - M - Evaluation Factors for Award.pdf"128832"file"".pdf""1""2026-06-05T14:35:46.67+00:00""adf6a82e8e1c4bf7a8f56dca68f088d4""private""0""controlled""2fdc3eb029644e6ba5ed85bd59660d4f""1"5"0""Attach 5 - USCP Request for Criminal History.pdf"270736"file"".pdf""1""2026-06-05T14:35:46.67+00:00""812d5289645f408796f6a6979bb97cd9""private""0""controlled""2d306a11f2b64dafa6e7454bc8d9514c""1"4"0""Attach 10 - Past Performance Questionnaire.pdf"135740"file"".pdf""1""2026-06-05T14:35:46.67+00:00""419ae9a453db421f8226163bf46c9d9e""private""0""controlled""fa03d63187fc4286b54b798296b34f11""1"3"0""Attach 2 - Wage Determination 5.18.26.pdf"39708"file"".pdf""1""2026-06-05T14:35:46.67+00:00""679df12e899d4e84ba66e5b6ad8deec7""private""0""controlled""65d04f825705472aba141444afd05b7b""1"2"0""AOCACB26R0033.pdf"1296844"file"".pdf""1""2026-06-05T14:35:46.67+00:00""0e6c062cc23b4d559ed85a8a6a8b74dc""private""0""controlled""9f8598d1090d48c585b5ea392c47f999""1"1"0"Source: SAM.gov (notice 8d7e8e41518b470ab8e858f066b5b4cc), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.