Installation of 30 Government-Furnished Walkway Lighting IWO Jima Marine Corps Memorial ¿ George Washington Memorial Parkway
The contractor shall furnish all labor, materials, equipment, tools, and services necessary to install 30 Government-furnished replacement walkway light fixtures at the Iwo Jima United States Marine Corps Memorial. Work includes inspecting and replacing existing wiring as needed, installing new electrical conductors, junction boxes, pull boxes, grounding and bonding, connecting to existing electrical service, mounting and securing the fixtures, testing and commissioning the complete system, and restoring all disturbed areas. The work is divided into two phases: Phase 1 (7 days) for electrical wiring and Phase 2 (10 days) for fixture installation, with a 30-day warranty period after final acceptance.
We post new electrical opportunities in Virginia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""20170""HERNDON""VA""USA""381 ELDEN STREET""SUITE 4000""Sol_140D0427Q0879.pdf"429273"file"".pdf""1""2026-10-02T19:53:21.778+00:00""5aa4640187464dc9a2028a6f50ef13a6""public""0""public""45d25114802c46cba569fad8af338209""0"1"0"Most Virginia work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 87fb1642a62a45fa9bd14da4787acc7d), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.