**Amendment 0001 Key Changes Summary: Milestone Extensions:-ProjNet RFI Cutoff: Extended to 13 August 2026, 10:00 AM EDT (originally 03 August).-Bid Submission Deadline: Extended to 01 September 2026, 10:00 AM EDT (originally 25 August).-Virtual Bid Opening: Rescheduled to 01 September 2026, 11:00 AM EDT (originally 25 August).Geotechnical and Sediment Data:-Incorporates four (4) sediment reports for: Craighill Entrance, Craighill Angle, Craighill Upper Range, and Cutoff Angle.-Clarifies that geotechnical data is unavailable and will not be provided for Curtis Bay and Brewerton Angle. Plan Sheet Revisions:-Sheet V116 (Coordinates): Removes F1 from the Dredge Area Coordinates box and updates the coordinates for points F1 and F9.Sheet V112 (Poplar Island): Adds Inflow Point 8 to the Poplar Island drawings. **END Amendment 0001 Key Changes Summary****The project consists of maintenance dredging approximately 2,250,000 cubic yards (cy) from the deep-draft federal navigation channels serving the Port of Baltimore. The work is to be performed between November 2026 through March 2027.
The dredging depth for all channels is 50 feet mean lower low water (ft MLLW) with an additional 1 ? 2 foot of allowable overdepth. Approximately 1,538,000 cy will be dredged from the Maryland approach channels (Craighill Entrance, Craighill Angle, Cutoff Angle, and Upper Range Channels) and placed at the Paul S. Sarbanes Ecosystems Restoration Project at Poplar Island.
Approximately 700,000 cy will be dredged from Baltimore Harbor Channels (Brewerton Angle and Curtis Bay Channels) and placed at the Cox Creek Dredged Material Containment Facility. The work areas are within heavy commercial waterways supporting the Port of Baltimore. The equipment required for this work commonly consists of two 30 plus cubic yard clamshell dredges, one 24 ?
30-inch hydraulic unloader, six to eight large tugs, six to eight 2,500 ? 6,000 cubic yard material scows, a drag bar and barge, and appropriate attendant plant and pipeline. The material will be dredged by clamshell/bucket and scow and placed within a period of performance of approximately 120 calendar days from receipt of Notice-to-Proceed.
The project consists of maintenance dredging approximately 2,250,000 cubic yards (cy) from the deep-draft federal navigation channels serving the Port of Baltimore. The work is to be performed between November 2026 through March 2027. The dredging depth for all channels is 50 feet mean lower low water (ft MLLW) with an additional 1 ? 2 foot of allowable overdepth. Approximately 1,538,000 cy will be dredged from the Maryland approach channels (Craighill Entrance, Craighill Angle, Cutoff Angle, and Upper Range Channels) and placed at the Paul S. Sarbanes Ecosystems Restoration Project at Poplar Island. Approximately 700,000 cy will be dredged from Baltimore Harbor Channels (Brewerton Angle and Curtis Bay Channels) and placed at the Cox Creek Dredged Material Containment Facility. The work areas are within heavy commercial waterways supporting the Port of Baltimore. The equipment required for this work commonly consists of two 30 plus cubic yard clamshell dredges, one 24 ? 30-inch hydraulic unloader, six to eight large tugs, six to eight 2,500 ? 6,000 cubic yard material scows, a drag bar and barge, and appropriate attendant plant and pipeline. The material will be dredged by clamshell/bucket and scow and placed within a period of performance of approximately 120 calendar days from receipt of Notice-to-Proceed.
"21201-2526""BALTIMORE""MD""USA""RESOURCE MANAGEMENT OFFICE""2 HOPKINS PLAZA""https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912DR26BA011¬iceType=SolicitationNotice"0"link""1""2026-07-16T19:21:04.169+00:00""bb0a8fc9b9374ed6a43ef8a3e5890e47""public""0""PIEE Solicitation Module Link for W912DR26BA011""public""36fccd9e60734de3b48e785136ac628f""0"4"0""https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml"0"link""1""2026-07-16T19:21:04.169+00:00""c432256a1b4f4e6ab5809c432ab06a56""public""0""Web Based Training for the PIEE Solicitation Module""public""9956db79123c40aa9bf42be6c3915459""0"3"0""https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf"0"link""1""2026-07-16T19:21:04.169+00:00""d645ffbecaac407f91050d11f658660a""public""0""Registration Instructions for the PIEE Solicitation Module""public""5cf9ab782c834efe9d35f3b17ca47f30""0"2"0""https://dodprocurementtoolbox.com/"0"link""1""2026-07-16T19:21:04.169+00:00""32c5a9567fa747cab14e3cc52d418114""public""0""Department of Defense Procurement Toolbox""public""6c97295719994b518bd424f0844c2736""0"1"0"Source: SAM.gov (notice 777c83c2e9f14fa59a09f3720528ecd2), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.