We post new goods & materials opportunities in Massachusetts as agencies publish them. Get them in one email — free, and unsubscribe whenever.
See Attachment "Raytheon RFP Qatar Spares 2.0 Contract (SPRRA226R0064)" for further details and "Spares List_Qatar Spares 2.0_23Mar26" for a list of parts to acquire the labor costs associated with a normal spares purchase to assemble, test, and integrate the finished hardware.
****AMD 0001 posted on 7/28/26 to extend the proposal due date to 8/31/26.
The contractor must provide labor to assemble, test, and integrate hardware for Qatar PATRIOT spares, specifically for the PATRIOT Radar and Battle Management Command and Control System (BMC4I) hardware in support of the PATRIOT Weapon System. The work includes pricing the labor associated with parts listed in Attachment 0001 (Spares List_Qatar Spares 2.0_23Mar26) and shipping to locations specified in Attachment 0002 (SHIP TO Qatar Spares_13APR26). The contractor must submit a summary schedule with fully supportable cost data, including labor categories, hours, material and equipment cost, and total cost breakdown, in accordance with FAR 15.408, Table 15-2.
"35898-7340""REDSTONE ARSENAL""AL""USA""DLR PROCUREMENT OPERATIONS (AH)""5201 MARTIN ROAD""Raytheon RFP Qatar Spares 2.0 Contract (SPRRA226R0064).pdf"428608"file"".pdf""1""2026-04-29T17:56:53.454+00:00""2ec8911e8349489eb62d4b4c4ac7aebf""public""0""public""5e01bede5c3d45968fd54596210e148c""0"2"0""Spares List_Qatar Spares 2.0_23Mar26.xlsx"68220"file"".xlsx""1""2026-04-29T17:56:53.454+00:00""65956b0845004db1b498b519dd20c8d5""public""0""public""585836e1c70c4e8d8e52a89632483e94""0"1"0"Source: SAM.gov (notice 6590117702e1451689ffdc889a78423d), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.