We post new general contractors opportunities in Ohio as agencies publish them. Get them in one email — free, and unsubscribe whenever.
This project provides the necessary upgrades to building #203 aircraft engine shop, to maintain the required number of new C130J aircraft engines and propellers to support the YARS mission. The renovations to building 203 include the construction of enclosed areas within the existing workshop, facilitating the ability to maintain and store engines on stands, as well as a room to perform repairs of the J-model propeller blades. These rooms will be temperature and humidity-controlled to meet storage and repair requirements.
Reference attachments for Statement of Work and Specifications
The work includes demolition of existing elements, construction of new enclosed areas with metal stud walls, installation of overhead doors, HVAC systems to maintain temperature and humidity, relocation of utilities, and associated electrical and mechanical work. The project also includes installing fire suppression system modifications, painting, and providing as-built drawings.
"44473-0910""VIENNA""OH""USA""ADMINISTRATIVE ONLY NO REQUISITIONS""3976 KING GRAVES RD""Solicitation - FA665626B0005.pdf"607500"file"".pdf""1""2026-08-05T16:40:49.981+00:00""41badbbe10834ccc941b7f415d157e50""public""0""public""47e63896d4634ffaa93f9953d1ffaa37""0"7"0""Attachment 06 Base Access Requirements ZQEL 26-0001.docx"25952"file"".docx""1""2026-08-05T16:40:49.981+00:00""16fb9e72c3984443b09367d748b9733a""public""0""public""56f1704736ce4c92accf2bafa55b1cbc""0"6"0""Attachment 05 Question Submission Form ZQEL 26-0001.docx"20068"file"".docx""1""2026-08-05T16:40:49.981+00:00""a0d1ed129823482eb5c74cbe2f3c1cb3""public""0""public""9f4b91c4ad59410a9cbbe2d7f6c6e25f""0"5"0""Attachment 04 Responsibility Questionnaire ZQEL 26-0001.docx"23929"file"".docx""1""2026-08-05T16:40:49.981+00:00""a044e77861d443a38f3853fc297771cf""public""0""public""c97c5f6d2fc5408f840e46ddff8835d1""0"4"0""Attachment 03 Project ZQEL 24-0006 Statement of Work.pdf"231808"file"".pdf""1""2026-08-05T16:40:49.981+00:00""61f371c2914d4b0c9c884d345a278662""public""0""public""90379186b06643cf914d6e0c4ca34b3e""0"3"0""Attachment 02 Project ZQEL 24-0006 Specifications.pdf"11632878"file"".pdf""1""2026-08-05T16:40:49.981+00:00""ffcda449f318429c958526926302a42d""public""0""public""2f061c6f941545c79d378ccbd6a19343""0"2"0""Attachment 01 Wage Determination.txt"16951"file"".txt""1""2026-08-05T16:40:49.981+00:00""e4c91b4973744f8fa7bdee1802454bcc""public""0""public""7d8a2e79ceae4a99941481e04beaca86""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice 6565ee9eda424071b94e43d314b4eb59), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.