We post new asphalt opportunities in Arizona as agencies publish them. Get them in one email — free, and unsubscribe whenever.
The Tonto National Forest - Tonto Basin Ranger District - plans to repair leaks in its drinking water network. The main objective of the project is to eliminate the known leaks and reduce potential for future leaks. At the end of the project, the contractor shall provide as-built drawings of the project to the Forest Service.
Leaks were noticed on the secondary pipes that feed 1- or 2-inch recreation hydrants. The Forest Service plans to relocate the hydrants to the main lines, abandoning the leaking pipes in place. One known leak to be repaired may be under the asphalt of the campground loop. After backfilling the trench, the contractor must place new asphalt over the cut portion and make necessary adjustments to return the loop to its original shape.
The contractor shall install one priority valve and two pressure reduction valves at the locations indicated by the Contracting Officer's Representative (COR). These values are critical in reducing and addressing potential leaks in the future.
The contractor shall provide all personnel, equipment, tools, and materials to accomplish the project. The contractor is responsible for the supervision, incidentals, and services required to perform the work in strict accordance with the applicable codes and requirements and the contract document.
The contractor shall relocate water hydrants at Teddy Bear and Christmas Loops to the main water line, abandon old hydrant lines in place, and cap T-fittings. At Grapevine Goose Loop, the contractor shall locate and repair a water line leak under asphalt pavement, then replace the asphalt. At Grapevine Group Site, the contractor shall install a pressure priority valve and a pressure reduction valve. At Cholla Campground, the contractor shall install a 4-inch pressure reduction valve. The contractor shall provide all personnel, equipment, tools, and materials, and at project completion provide as-built drawings to the Forest Service.
"US""US""871023498""Albuquerque""NM""USA""333 Broadway BLVD SE""Attachment 7 - Drawings.pdf"1426175"file"".pdf""1""2026-08-06T20:22:09.854+00:00""045ca990d3564173950674e669f294a3""public""0""public""875538c34b4c4e4c9d931482cd5ecb48""0"8"0""127EAX26Q0087 TBRD Water Leak Repair.pdf"282841"file"".pdf""1""2026-08-06T20:14:16.343+00:00""98b7a7e6ef5e4e6a98ae6c9b89b2661c""public""0""public""ec66727425d74ff5a9f190705e4b003f""0"7"0""Attachment 1 - Statement of Work.docx"93964"file"".docx""1""2026-08-06T20:14:16.343+00:00""207f4aeede854e6f9409503e8914ed89""public""0""public""6378a2b7e769458f8bc7d9521f53f862""0"6"0""Attachment 2 - Industrial Fire Plan.pdf"312752"file"".pdf""1""2026-08-06T20:14:16.343+00:00""a6acfbf58275489ab93540300ae9fd1c""public""0""public""9bbb43791454427abd93b066f3f2785b""0"5"0""Attachment 3 - Directional Maps.pdf"520970"file"".pdf""1""2026-08-06T20:14:16.343+00:00""a487f6712a014405b5a68ff2f7f498f3""public""0""public""e4a3f06ce2be4e6d887bba843f9d2d65""0"4"0""Attachment 4 - Pictures.docx"14106092"file"".docx""1""2026-08-06T20:14:16.343+00:00""d711ff27e7c644a2b5bacf022f3c522a""public""0""public""a3d7cff3febb453cb3c5037923db196c""0"3"0""Attachment 5 - Schedule of Items.xlsx"12637"file"".xlsx""1""2026-08-06T20:14:16.343+00:00""bdbe699eb94041fa9831c63e95928910""public""0""public""66694f6934814642a2593220f59c4721""0"2"0""Attachment 6 - Wage Determination.pdf"239128"file"".pdf""1""2026-08-06T20:14:16.343+00:00""a781e96a9962480fbdc2b5337a9d5fce""public""0""public""b690ede76ec24aeea71248515f216486""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice 634dc17ceb484e81b84b6c48fdfd9189), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.