**Amendment 0008 is hereby posted. **
===============================================================================================
**Amendment 0007 is hereby posted. **
===============================================================================================
**Amendment 0006 is hereby posted. **
===============================================================================================
**Amendment 0005 is hereby posted. **
===============================================================================================
**Amendment 0004 is hereby posted. **
===============================================================================================
**Amendment 0003 is hereby posted. **
===============================================================================================
The planned project is to design and construct a U.S. Land Port of Entry that will reflect the critical importance of this crossing as a gateway to the United States of America.
The DB scope of work includes all labor and materials required to provide design and construction services for the BOTA LPOE project pursuant to the Federal Acquisition Regulation (FAR) Two-Phase Design Build Selection Procedures and incorporating Art in Architecture Program, and Design-Construction-Operational Excellence policies and procedures. The resultant contract will be firm fixed price.
The project is funded under the Infrastructure Investment and Jobs Act (IIJA). Phase 1 is complete. The shortlisted offerors were announced via www.sam.gov.
Phase 2 RFP is hereby issued under Amendment 0002 with an award anticipated January 2027. This is a negotiated, best value procurement.
Any questions regarding this notice shall be directed to the Contracting Officer whose name appears herein. Shortlisted offerors are responsible for monitoring and downloading the solicitation and any potential amendments, if any, to the RFP/solicitation.
The design-build contractor provides all labor and materials for design and construction of the BOTA LPOE, including the main building, noncommercial inspection lanes and head house, outbound inspection, FMCSA bus inspection, TABC building, site utilities, site work, demolition with abatement and remediation, and CBP furniture and move services. Options cover a kennel building, 8 additional lanes, a trusted traveler building and a narcotics vault. Artwork protection, storage and relocation of the Eagle and Lion statues is included in the base scope.
We post new general contractors opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"10 BOTA Phase 2 RFQ 47PB5126R0003 Final Amd 0008.pdf"327488"file"".pdf""1""2026-10-08T12:05:44.459+00:00""55684b630bee4879adb71f31618c0f3f""public""0""public""dfc7d1e2840a42c7b880eb05d1a90773""0"7"0""10 BOTA Phase 2 RFQ 47PB5126R0003 Final Amd 0007.pdf"624395"file"".pdf""1""2026-10-05T20:50:43.624+00:00""eb2085c5e5874abca20c5ad112ed0276""public""0""public""1b2c7da2a8b94601aa771d6c8c97bb46""0"6"0""10 BOTA Phase 2 RFQ 47PB5126R0003 Final Amd 0006.pdf"1098035"file"".pdf""1""2026-09-30T19:51:26.891+00:00""a0cf3512bf8442618f67303f24e8dddf""public""0""public""042a9e9f9aaa45ffa50c5e9a8da2a13e""0"5"0""10 BOTA Phase 2 RFQ 47PB5126R0003 Final Amd 0005.pdf"345996"file"".pdf""1""2026-09-17T13:08:33.745+00:00""3a34320da4b54f54824f97afb87f8ee0""public""0""public""b0cbdd3d35c142699006e57fecd19bde""0"4"0""10 BOTA Phase 2 RFQ 47PB5126R0003 Final Amd 0004.pdf"538202"file"".pdf""1""2026-09-16T19:25:20.291+00:00""b9d3674a20e7448a856c05d3cf6735c7""public""0""public""b0c067448b5b4e14a2c65343ee38a95b""0"3"0""10 BOTA Phase 2 RFQ 47PB5126R0003 Final Amd 0003.pdf"451916"file"".pdf""1""2026-08-12T18:47:25.29+00:00""00ea9fb4c6884a57af08ac63d1267fb5""public""0""public""c87b06ee0e5546aeb707c6bd0900ab48""0"2"0""10 BOTA Phase 2 RFQ 47PB5126R0003 Final Amd 0002.pdf"5435263"file"".pdf""1""2026-07-15T16:07:25.985+00:00""f5036b7b582d48cd837bf9cbe423c9af""public""0""public""0bd3a00dec4f497f81cbc7a61491d8fa""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 58acf377a4cd4e54a3a0a9c139693f40), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.