The objective of this project is to completely demolish the exterior connecting corridor and relocate any active utilities currently tied to the corridor underneath grade at the Walla Walla Veteran Affairs Medical Center (VAMC).
This acquisition is 100% set-aside for Service-Disabled Veteran Owned Small Businesses (SDVOSB) utilizing competitive, best value tradeoff source selection procedures in accordance with FAR (Overhaul) Part 15. The NAICS Code is 238910 with a size standard of $19 Million. The period of performance is 365-Calendar Days from the issuance of the Notice to Proceed. The Magnitude of Construction is between $5,000,000 and $10,000,000.
Site Visit: August 3, 2026; 10:00am - 1:00pm PDT
Questions: Submit via email to cynthia.dmitrijev@va.gov and susan.howe2@va.gov no later than August 10, 2026 @11:00am PDT.
Proposal Due: August 26, 2026 @ 11:00am PDT
Please see the solicitation document and attachments for details.
The contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for VA Project 687-24-101 as required by drawings and specifications. The work includes demolishing the exterior connecting corridor and relocating active utilities underneath grade at the Walla Walla VAMC.
"US""98662""VANCOUVER""WA""USA""5115NE 82ND AVE""SUITE 102""Solicitation 36C26026R0080_Connect Corridor 687-24-101.pdf"747004"file"".pdf""1""2026-07-28T00:18:22.474+00:00""a3854fb32b9642edacf71faa5cd4469f""public""0""public""445bb549b27745beb04ef3d19f081f64""0"16"0""Atch 1 - SOW_Connect Corridor 687-24-101.docx"20544"file"".docx""1""2026-07-28T00:18:22.474+00:00""91dc758d7ae54ecebe0b278295473de9""public""0""public""9e31d584f2eb4f0c8ad097014492ddaf""0"15"0""Atch 2 - Drawings_Connect Corridor 687-24-101.pdf"78423634"file"".pdf""1""2026-07-28T00:18:22.474+00:00""afca2c21ab0f4d819ebbae1a27e79a68""public""0""public""6292cf75881041ce9ee0446f7e3a401d""0"14"0""Atch 3 - Specs_Connect Corridor 687-24-101.pdf"6768234"file"".pdf""1""2026-07-28T00:18:22.474+00:00""416faf613b1c4562bc9be43f72b0c0d7""public""0""public""9f9d182526cc481da20912f66a7dc41f""0"13"0""Atch 4 - Bldgs 68 and 69 Phase 3 PCRA_Connect Corridor 687-24-101.pdf"527731"file"".pdf""1""2026-07-28T00:18:22.474+00:00""6e4e7e5a565648faa9684165bd66169b""public""0""public""f4b370fdbe3c4ab9ad8832b64664a96f""0"12"0""Atch 5 - Bldg 68 Sprinkler Demo Install PCRA_Connect Corridor 687-24-101.pdf"583226"file"".pdf""1""2026-07-28T00:18:22.474+00:00""d172ce6596f7499d9d89439b28f4d400""public""0""public""a3c9ac9d2acf47ee983dcdf0dea7b29e""0"11"0""Atch 6 - Bldg 74 Phase 4 PCRA_Connect Corridor 687-24-101.pdf"523231"file"".pdf""1""2026-07-28T00:18:22.474+00:00""49f28f0f570746d49bc8d9405ea95eec""public""0""public""88f0036c8e3446d59bb908368668aa8e""0"10"0""Atch 7 - Bldg 74 Sprinkler Demo PCRA_Connect Corridor 687-24-101.pdf"600615"file"".pdf""1""2026-07-28T00:18:22.474+00:00""84cd932ef8b24bae826ce098a72fabf7""public""0""public""d83ae13d5d2743e2a5924bf977e50eb0""0"9"0""Atch 8 - Bldg 75 Phase 2 PCRA_Connect Corridor 687-24-101.pdf"424915"file"".pdf""1""2026-07-28T00:18:22.474+00:00""44672eecc1aa42ccacd2ad65b7d5a041""public""0""public""797a621f59c4432baa2af2f6ec6bc778""0"8"0""Atch 9 - Bldg 78 Phase 1 PCRA_Connect Corridor 687-24-101.pdf"474630"file"".pdf""1""2026-07-28T00:18:22.474+00:00""c616a741e95d4dd3ba9ee7559865fd9e""public""0""public""ee289087cff84d9f8591e028f13e8333""0"7"0""Atch 10 - Bldg 80 Phase 3 PCRA_Connect Corridor 687-24-101.pdf"528496"file"".pdf""1""2026-07-28T00:18:22.474+00:00""d74162f31f574176a3b8621d87a93dbd""public""0""public""d8aeffb547be459296afa83b485f4cb9""0"6"0""Atch 11 - Divisional Price Breakout_Connect Corridor 687-24-101.xlsx"14205"file"".xlsx""1""2026-07-28T00:18:22.474+00:00""00e8c33b36fa472585c8977844cc4422""public""0""public""a70fee580838485e8db88d8a7bcfc977""0"5"0""Atch 12 - Limitations on Subcontracting_Connect Corridor 687-24-101.pdf"160490"file"".pdf""1""2026-07-28T00:18:22.474+00:00""43b772d4a3fc48d383387ed4dc0bb209""public""0""public""c11e75efec5d4d8f8854afd9529f1bcd""0"4"0""Atch 13 - Contractor Rules of Behavior_Connect Corridor 687-24-101.pdf"183304"file"".pdf""1""2026-07-28T00:18:22.474+00:00""6d5caf0e45a8496dae05e40f09192bc9""public""0""public""d4eb3697c894403782b074cd415996da""0"3"0""Atch 14 - Past Performance Questionnaire_Connect Corridor 687-24-101.docx"114736"file"".docx""1""2026-07-28T00:18:22.474+00:00""f2b7af896d1a43dba95a7e6d5ad604d2""public""0""public""782b8d4ce36440c89f3b56f5cae01b90""0"2"0""Atch 15 - Wage Determination 01.23.2026, Connect Corridor, 687-24-101.pdf"2150585"file"".pdf""1""2026-07-28T00:18:22.474+00:00""d4d5d6ee1bfc4cdf954861b0f4d12e35""public""0""public""4edefae5e0e54e63bc709d52949933d9""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.