We post new plumbing opportunities in Pennsylvania as agencies publish them. Get them in one email — free, and unsubscribe whenever.
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation; quotes are being requested, and a separate written solicitation will not be issued.
Solicitation number 12445526Q0103 is issued as a Request for Quotes (RFQ) for construction services for ALF Vault Toilet Replacement. Work for this project consists of, but is not limited to removal of a vault toilet and replacement with a new vault toilet at Webb's Ferry boat launch on the Allegheny National Forest, Warren County, Pennsylvania. Contractors are strongly encouraged to inspect the location before submitting a quote. A site visit is scheduled for August 4, 2026, at 10am ET at the Allegheny National Forest Webbs Ferry Vault Toilet Latitude: 41.99555556 Longitude: -78.96305556. Interested parties should contact Justin Woldt at Justin.Woldt@usda.gov if they plan to attend.
This acquisition is set-aside for small business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov.
The applicable North American Industry Classification Standard Code is 236220 - Commercial and Institutional Building Construction . The small business size standard is $45,000,000.00 This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quote which will be considered by the agency.
Questions shall be submitted via email to Kevin.Brown2@usda.gov and are due no later than August 10, 2026, at 12:0P AM Eastern Time. This will ensure enough time to respond before the solicitation period ends. Please include the solicitation name and number as the subject line of the email.
Work includes removal of the existing above-ground vault toilet structure, concrete slab, and building base; pumping and disposal of vault contents by a licensed sewage hauler; clearing and grubbing; structure excavation and backfill; placement of aggregate base course and surface course; furnishing and installing a CXT Gunnison (or approved equal) single vault toilet; vault toilet placement and installation; erosion control, seeding and mulching; and construction of an accessible paved pathway connecting the new vault toilet entrance to the existing parking area. The contractor must maintain a safe site, protect existing vegetation, and complete all work by December 30, 2026.
"US""US""303092449""Atlanta""GA""USA""1720 Peachtree ST NW STE 876S""C04_RFQ 12445526Q0103.pdf"400438"file"".pdf""1""2026-07-16T14:33:38.827+00:00""4eb572d1f9114ad2921c5fc01a75b5e9""public""0""public""ae1adbd1f724495fa0f3a644a54c10c9""0"7"0""C04a_Attachment 1 Statement of Work.pdf"264994"file"".pdf""1""2026-07-16T14:33:38.827+00:00""aa30c4f76d17478788d9a9b388899266""public""0""public""1645ed52b1414b8eaef115d1f2dbcf4c""0"5"0""C04b_Attachment 2 Wage Determination 260518.pdf"42675"file"".pdf""1""2026-07-16T14:33:38.827+00:00""114a2f5029b24b088b14b5946667bd5d""public""0""public""8c994e81445b4eeea8087001bddc9c96""0"3"0""Q and A Document 1.pdf"1761972"file"".pdf""1""2026-08-05T13:19:54.839+00:00""fba8d4f042184839b49b2576e20f1123""public""0""public""794c3942f9a747eca62f66f4736cb0f9""0"2"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice 53b8c56052274e27aa0d4872b9c9706d), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.