36C25723R0049 A0003 - Increase from original 35 cap for A/E Contractors on the Short Selection Database to 50.
The database will be used to award AE contracts for projects such as low volume design, design of small warehouses and offices, building renovations, historic preservation, energy efficiency improvements, energy audits, photovoltaic and renewable energy systems, LEED consulting, HVAC design, electrical and lighting design, water and wastewater system design, construction inspection, construction period services, asbestos investigations, mapping, drafting, surveying, geotechnical investigation, and environmental investigations.
We post new architecture and design opportunities as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""78240""San Antonio""TX""USA""5441 Babcock Road""Suite 302""36C25723R0049 0003.docx"16115"file"".docx""1""2026-07-20T16:38:26.293+00:00""93fb40da70004cfdb2316b7491bacc1c""public""0""public""acdd75b24b7c4c6bb5766971e751df2d""0"7"0""Current Listing of AE Contractors on Short Selection Database 36C25723R0049.pdf"95158"file"".pdf""1""2025-01-13T18:51:56.601+00:00""e86bf5cab9ce4cabbeef2c7458866e12""public""0""public""cf8d91a93b3441908d647968820a266c""0"6"0""36C25723R0049 0002.docx"24786"file"".docx""1""2023-09-13T20:01:10.333+00:00""7a701179ad304181b6906dc2533035c7""public""0""public""be339db278af4e53b060e246e0ee113c""0"5"0""36C25723R0049 0001.docx"23931"file"".docx""1""2023-09-11T21:24:54.354+00:00""b6564048f1c2417f9c762022c7d085a4""public""0""public""0e3ed6e534fd48fc8ce1c20e6051b77b""0"4"0""36C25723R0049.docx"28058"file"".docx""1""2023-08-29T19:59:16.904+00:00""64b75ae786e14f2e922e6578a21cba3c""public""0""public""d21c609eaa8645ac9a59e22efec8aca6""0"3"0""SF330-16f.pdf"3483436"file"".pdf""1""2023-08-29T16:14:00.001+00:00""6d469433578a4d85837adbd27f7ac64d""public""0""public""ae5356786e2b4d68ba4a0604dc8b75ea""0"2"0"Most public work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 5073642275214db4a200d4010bd55522), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.