This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued.
Solicitation number 127EAX26Q0114 is issued as a Request for Quotation (RFQ) to furnish all labor, materials, tools, transportation, and necessary supervision to perform campground improvements at Shirley Creek Campground, on the Brownstown Ranger District of the Hoosier National Forest. This project will develop individual campsites at the existing Shirley Creek Campground. Work includes staking camping spurs from plans, stripping turf, earthwork, excavating campsite spurs and social areas to sub-grade, install and compact aggregate base course, install and compact aggregate surface course, grading to ensure proper drainage around spurs and social areas, and restoring areas disturbed by construction operations with topsoil, seed and mulch. Stripped turf and excess earthen materials are to be disposed of, by the contractor, to on-site locations within the campground which will be designated by the COR.
This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 238910 The small business size standard is $19M This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.
Questions shall be submitted via email to christopher.malley@usda.gov and are due no later than September 28, 2026, at 1:00 PM Eastern Time. This will ensure enough time to respond before the solicitation period ends. Please include the solicitation name and number as the subject line of the email.
Amendment 0001 is added to extend the quote due date. The quote due date is extended to 10/14/2026 @ 1:00 PM ET to allow time for question responses to be posted.
Quotes shall be submitted electronically via e-mail to christopher.malley@usda.gov and pps.proposals@usda.gov and are due NLT October 14, 2026, at 1:00 PM Eastern Time.
Develop individual campsites at existing Shirley Creek Campground comprising 6 standard campsite spurs, 1 pull-through campsite, 1 double campsite spur, 2 tent sites with dedicated parking, campsite social areas and tent pads with aggregate surfacing, campground overflow parking and day use parking area with aggregate surfacing, and campground drive widening. Work includes staking campsite spur centerlines and corners from plans for CO approval, stripping turf from campsites and depositing at COR-designated on-site locations, excavating campsite spurs and social areas to subgrade depth, filling and grading as required to establish proper drainage slopes, installing and compacting 6-inch INDOT #53 aggregate base course, installing and compacting 3-inch INDOT #73 aggregate surface course, and restoring all disturbed areas with native topsoil, seeding and mulching. Contractor to verify all site measurements, perform proof-rolling of subgrade, maintain erosion controls during operations, and ensure site restoration meets 90% turf coverage criteria.
We post new asphalt opportunities in Indiana as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""US""871023498""Albuquerque""NM""USA""333 Broadway BLVD SE""127EAX26Q0114 Amendment 0001 - Extension.pdf"99502"file"".pdf""1""2026-10-07T13:16:32.826+00:00""f14a0880cdcb4fba9ef18901af4cf7da""public""0""public""0f8ecc0ef5c14a26aa515ce7b4ba7ec6""0"10"0""Attachment 3 - Project Map.pdf"5610605"file"".pdf""1""2026-09-17T20:33:23.642+00:00""bef8ea8f46d1401e8ca8e10c119a78de""public""0""public""b5dfb76264f642c2b40c8863290090c7""0"9"0""Attachment 2 - SOW_Specs.pdf"1302396"file"".pdf""1""2026-09-17T20:33:23.642+00:00""b11316dae8d1421dac6b018d38ed699c""public""0""public""9d101dccc7154ebeb3d080c6083be0b1""0"8"0""127EAX26Q0114 - Shirley Creek Campground Improvements.pdf"673171"file"".pdf""1""2026-09-17T20:33:23.642+00:00""38376599f2724dc1b87353d8a59499c8""public""0""public""474f90ae459e4a1faa65fed8634d2046""0"7"0""Attachment 4 - Shirley Creek_Drawing_CS-01.pdf"406937"file"".pdf""1""2026-09-17T20:33:23.642+00:00""28fc25d587784806b5859b9345e0f6f6""public""0""public""939c9d6b3a054e568757e91bb3135b08""0"5"0""Attachment 5 - Shirley Creek_Drawing_CS-02.pdf"242393"file"".pdf""1""2026-09-17T20:33:23.642+00:00""120df7efc8d04a5d94f346661095c9f5""public""0""public""991647d77cfc49c5aefa8c3cbc3a7a7a""0"4"0""Attachment 6 - Shirley Creek_Drawing_CS-03.pdf"213387"file"".pdf""1""2026-09-17T20:33:23.642+00:00""1b2372ba895e49c19e7c0e4b93d2aca0""public""0""public""2393fd4971194fcda2c08d1e574dffa7""0"3"0""Attachment 7 - Wage Determination_Orange County_IN.txt"142089"file"".txt""1""2026-09-17T20:33:23.642+00:00""17c4aa59b68140b1a0ea282ba674e5c5""public""0""public""06f3e3b88fc64fc38911b7cb211b45f9""0"2"0""Attachment 1 - Schedule of Items.pdf"72413"file"".pdf""1""2026-09-17T20:33:23.642+00:00""0577a6012fec461882dce46706c13d04""public""0""public""2c9da69e90ba423880583052c3287d01""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 4c64e0154a664f709da1e9bff953aad2), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.