We post new wall-making opportunities as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Solicitation notice –Repair of Masonry Wall
Ref: 19SW8026Q0007
The Embassy of the United States of America invites you to submit a quotation for a project
entails Landscaping Courtyard and Lobby at the US Chancery at the U.S. Embassy properties in Stockholm.
The U.S. Government intends to award a contract/purchase order to the responsible company submitting an acceptable offer at the lowest price. We intend to award a contract/purchase order based on initial quotations, without holding discussions, although we may hold discussions with companies in the competitive range if there is a need to do so.
Interested parties should complete attached RFQ package from the Stockholm Procurement Team by email at STKgsocontracts@state.gov using; 19SW8026Q0007 Repair of Masonry Wall in the subject line.
The Embassy intends to conduct a site visit on 27th Aug 2026 11am local time at on Lidingö in Stockholm, address TBA. Prospective offerors/quoters should contact stkgsocontracts@state.gov by 19th Aug 10am with names of visitors and for additional information or to arrange entry.
Quotations are due by 11th Sep 2026 at 10.00 local time. No quotations will be accepted after this time. Proposals must be in English and incomplete proposals will not be accepted.
Your quotation must be submitted electronically to stkgsocontracts@state.gov
For any solicitation above $40k, offerors must be registered in the SAM (System for Award Management) database at https://www.sam.gov prior to submittal of their offer/proposal as prescribed under FAR 4.1102. Failure to be registered at time of proposal submission may deem the offeror’s proposal to be considered non-responsible and no further consideration will be given.
Sincerely,
Amanda Sanders
Contracting officer
The contractor shall furnish all supervision, labor, temporary works, engineering support, equipment, tools, materials, transportation, waste handling, documentation, and incidentals required to investigate, stabilize, repair, refinish, and protect the wall. Work includes preconstruction investigation and survey, selective demolition and removal, structural repair and reconnection of wall sections, surface restoration and finish repairs, replacement of top copper sheet coping/covering, cleaning and waste handling, and documentation. The contractor must provide a work plan, warranty documents, and a project report as deliverables.
"US""20520""WASHINGTON""DC""USA""DEPARTMENT OF STATE, 2201 C ST NW""19SW8026Q0007 RFQ PR16097277 Wall Repair- Combined.pdf"6212679"file"".pdf""1""2026-08-04T13:42:33.036+00:00""7e787fd19b444076b3e95542335ade60""public""0""public""f684b2689f07446f85d6729bfadf3a95""0"1"0"Source: SAM.gov (notice 47ca52c3d8194a39bcc8694b8dc9ef28), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.