We post new general contractors opportunities in Ohio as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Amendment 03 posted: August 10, 2026 - Incorporate RFIs and design addendums.
Amendment 02 posted: August 3, 2026 - Extension to due date. RFIs not ready to post yet.
Amendment 01 posted: July 13, 2026 - Site visit agenda and sign-in sheet.
**Site Visit Agenda **
EHRM Infrastructure Upgrades Construction – White River Junction, VT
Open meeting & Introductions
Contracting Officer – Megan Dohm
Contract Specialist: Jen Braaten
General Engineer: Jonathan Rugg, James Kirkpatrick
Introduction of Vendors
Reminder to sign the sign-in sheet
Solicitation Information
Please note that any verbal exchange at this site visit does not constitute a change to this solicitation. Only amendments constitute a change. Only questions received in writing and answered via solicitation amendment will be deemed official.
This solicitation is under NAICS Code 236220 Commercial and Institutional Building Construction.
This procurement is a 100% set-aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) concerns. Offers received from other than SDVOSB concerns will not be considered. All offerors must be certified as SDVOSBs by the U.S. Small Business Administration (SBA) and listed in the SBA Small Business Search database at time of bid submission and time of award. Failure to be BOTH visible and verified at the time of proposal submission and time of award will result in the offeror’s proposal being deemed unacceptable and ineligible for award.
Request for Proposal (RFP) IAW FAR Part 15, contract by negotiation.
Solicitation Closing Date: August 6, 2026, at 5**:00 PM ET**
Cut-off date for technical questions is July 23, 2026, at 5:00 PM ET
Technical Questions after the Cut-Off date will be reviewed, but the VA does not guarantee that they will be answered.
Please submit all technical questions to me via email at Jennifer.Braaten@VA.gov
Responses to technical questions will be posted in a timely manner as an amendment to the solicitation on sam.gov. Please confirm receipt of all amendments in RFP responses.
Proposal format submission requirements are located in the solicitation.
Only electronic copies of the bids will be accepted.
Please be advised that the bid bond shall be submitted as part of the electronic proposal submission. An original hard copy of the bid bond is no longer required.
Ensure that the Limitations on Subcontracting are included in your proposal as required per the Instructions to Offerors.
The VAAR range of magnitude for the project is between $20 and $50 Million. (NOTE That this project is at the lower end of this magnitude.)
The Period of Performance for the project is 450 calendar days after receipt of NTP.
A copy of the site visit sign in sheet will be provided as an amendment to the solicitation and posted to: sam.gov.
Questions
Please submit all technical questions in writing as outlined in the solicitation. All verbal communication is considered unofficial and for general information sharing only.
The site walk through should be done as a group, so please do not break-off and ask questions.
The contractor will perform construction, renovation, and upgrades to existing spaces to create new telecommunication rooms (TRs) and main communication rooms (MCRs) across numerous buildings (Buildings 1, 2, 4, 6, 7, 8, 9, 28, 31, 37, 39, 44, 65, 66, 67, 88, T58, T59, T60, T61, T62 and T63) at the VA Medical Center in White River Junction, VT. Work includes demolition of existing walls, ceilings, and flooring; construction of new walls and door frames; installation of fire-retardant plywood on walls for equipment mounting; application of anti-static floor coatings; installation of new resilient rubber base; and coordination with mechanical, electrical, and telecom trades for new equipment. The project also requires adherence to Infection Control Risk Assessment (ICRA) protocols, phasing of work in sections as directed by the VA's COR, and coordination with the VA for room closures and availability.
"US""44131""INDEPENDENCE""OH""USA""6150 OAK TREE BLVD""SUITE 300""Utility Shutdown Request Form.pdf"182100"file"".pdf""1""2026-08-10T22:33:56.676+00:00""da001365714b46f380807e4ddefbe696""public""0""public""c51d90b787f746c7aae9dcd5400fa74a""0"26"0""Addendum_Architectural Cutsheets.pdf"16042425"file"".pdf""1""2026-08-10T22:33:56.676+00:00""565a8c5965a04dc1a94c310260d7a346""public""0""public""370f10be83744f2c89d1f65f4a4bed98""0"25"0""Addendum_Architectural Spec.pdf"15724065"file"".pdf""1""2026-08-10T22:33:56.676+00:00""b1494927a1d4454c9ddb2668adc35fa8""public""0""public""299ac49b1936474194834dca5fa5fee3""0"24"0""Off Hours Work Request Form.pdf"176063"file"".pdf""1""2026-08-10T22:33:56.676+00:00""40738e1627ab456980078a8b04d2a7f6""public""0""public""610b109c81974abca190698a69b62369""0"23"0""Addendum_Metal Fabrication.pdf"680878"file"".pdf""1""2026-08-10T22:33:56.676+00:00""909e029b4e4543b8b26b8923a5e97ddf""public""0""public""e90d5210e299495e91d9a15b067d9ed5""0"22"0""36C77626R0092 0003.docx"120233"file"".docx""1""2026-08-10T22:33:56.676+00:00""6b68735aa0d24a1f9eb99499b667bf90""public""0""public""042471e012984bb4803d01785bab0bac""0"21"0""36C77626R0092 0002.docx"120173"file"".docx""1""2026-08-03T13:58:14.144+00:00""5d1c13895cea4a42bd26e6c0fe7af60e""public""0""public""427c47b11ab04d4696dd1d1d6f0706c7""0"20"0""S04_Site Walk Sign-in Sheet.pdf"169629"file"".pdf""1""2026-07-13T18:28:27.991+00:00""3667850af1624253b41b950194c2fc30""public""0""public""2334372a85ee46a7be15ee126b00c32f""0"19"0""36C77626R0092 0001.docx"33435"file"".docx""1""2026-07-13T18:28:27.991+00:00""d3e6579679e24234960e4cf1b2fbf659""public""0""public""533d0f4c5c3f4ced8e9d0b4c43a41f8a""0"18"0""Attachment 16_Project Experience.docx"31418"file"".docx""1""2026-07-02T17:14:01.044+00:00""e8943b63992043c8a357e7e3f374e7f4""public""0""public""82eba3b1d2ba4b56aab03addf024afe1""0"17"0""Attachment 15_Site Visit Instructions.docx"1274627"file"".docx""1""2026-07-02T17:14:01.044+00:00""01bc37f69f034fcfaff4cda5037d76b3""public""0""public""c68cb149eead4b068824e6b66690b9ee""0"16"0""Attachment 14_ PPQ.docx"114339"file"".docx""1""2026-07-02T17:14:01.044+00:00""1be6e57351ce4199aac1c2572a06ecbb""public""0""public""fdb7f567f73f4071b769ea95f024770e""0"15"0""Attachment 13_Limitations on Subcontracting.docx"27208"file"".docx""1""2026-07-02T17:14:01.044+00:00""c2cc4981283743849d9fcf0ef3de5ab2""public""0""public""3ce19017131346d893ab88746da8e8a1""0"14"0""Attachment 12_Division Cost Breakdown.xlsx"29001"file"".xlsx""1""2026-07-02T17:14:01.044+00:00""e2b44841fa674037bc989695117c0169""public""0""public""cfa1a075a7ff46b99ee260c8f2c0c521""0"13"0""Attachment 11_DavisBacon_Windsor Co. VT 05.18.26.pdf"1561128"file"".pdf""1""2026-07-02T17:14:01.044+00:00""a16e8a41f9be4b168f5f29916ec2e766""public""0""public""5c133e671af747db882f756414de7d09""0"12"0""Attachment 10_Brand Name Justification.pdf"307498"file"".pdf""1""2026-07-02T17:14:01.044+00:00""6a3a28ecba444fafa962ccb8a8018fc3""public""0""public""3eac49172a0448ecbbeb1f408e81fff9""0"11"0""Attachment 09_Asbestos and Lead Report.pdf"3870370"file"".pdf""1""2026-07-02T17:14:01.044+00:00""80b799759b3d47e28ea4fefa31578567""public""0""public""68eb6972315d4015a371947a6fb3d857""0"10"0""Attachment 08_Utility Locate.pdf"18279358"file"".pdf""1""2026-07-02T17:14:01.044+00:00""b48b5450385c478c9aa396be181983a5""public""0""public""baf696878f4a4a038a535addaa0ea3ac""0"9"0""Attachment 07_Mechanical cut sheets.pdf"35028975"file"".pdf""1""2026-07-02T17:14:01.044+00:00""627a045f737f48be81aa7323301c1dc6""public""0""public""56f97e13844541c6ae6b4b36abb8ca8f""0"8"0""Attachment 06_Electrical cut sheets.pdf"54518270"file"".pdf""1""2026-07-02T17:14:01.044+00:00""4622f6e96898489e9edafbf41490782e""public""0""public""3f20f1dc6e5944cc82cab00f310b565c""0"7"0""Attachment 05_Plans Addendum.pdf"636554"file"".pdf""1""2026-07-02T17:14:01.044+00:00""3fcbde2b66344ecab9bd82a29e5abeb6""public""0""public""b49740af2ab34b17b1108fc45ca7d6fd""0"6"0""Attachment 04_Plans Vol 3.pdf"34755717"file"".pdf""1""2026-07-02T17:14:01.044+00:00""78da3eab7f2e44d3853469c53893cfda""public""0""public""2d4ea5ff6f34424790de04eebf38cd18""0"5"0""Attachment 03_Plans Vol 2.pdf"48501945"file"".pdf""1""2026-07-02T17:14:01.044+00:00""858d2fec12814794bc24dc73da211ed1""public""0""public""0d8f505471f945128d0eda14c819ffb4""0"4"0""Attachment 02_Plans Vol 1.pdf"59428777"file"".pdf""1""2026-07-02T17:14:01.044+00:00""8daa562fa7b34e819c60035a192922c8""public""0""public""de25ab6a07e44f6782fb8164ff4a497d""0"3"0""Attachment 01_Specs.pdf"28992300"file"".pdf""1""2026-07-02T17:14:01.044+00:00""4f889bb2e1864b3cb64e6a913a1a6ba8""public""0""public""a36baa0858614cb296071c795612db60""0"2"0""36C77626R0092.docx"159933"file"".docx""1""2026-07-02T17:14:01.044+00:00""439bc7e86c4540d4bc8a7aa4f005e256""public""0""public""f2c2a572ece6476f843a42e36ea6bbe0""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice 41a33c1a2d334d478e7373d11a7bd94b), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.