THE WORK CONSISTS OF: Contractor shall furnish all labor, materials, and equipment necessary to provide snow removal services at Everett Lake, Weare, NH in accordance with the Performance Work Statement.
This procurement is set-aside for small business vendors. The applicable NAICS code is 561730 with a Small Business Size Standard of $9.5 Million.
ALL VENDORS MUST HAVE AN ACTIVE REGISTRATION IN SAM.GOV AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDERED. ANY VENDOR THAT DOES NOT HAVE AN ACTIVE SAM.GOV REGISTRATION WILL BE REJECTED AS NON RESPONSIVE.
The contractor shall provide snow plowing, snow shoveling, and sanding/salting services at the Everett Lake Project area located at 395 Clough Park Road, Weare, NH. Snow plowing includes the main parking area (approx. 17,000 sq ft) and the dam access road (approx. 42,000 sq ft). Snow shoveling includes in front of all buildings, doors, garage bays, around front access gate posts and arms, gatehouse bridge, and in front of heating fuel fill points (approx. 200 linear feet). Sanding/salting services shall be performed on an as-needed basis upon TPOC approval. The contractor shall provide all equipment, materials, labor, and transportation, including a 3/4 ton four-wheel drive truck, an 8-foot plow with four-way angling, and a powered sander with a minimum one-yard capacity. The contractor must submit various pre-work submittals including an Accident Prevention Plan, Activity Hazard Analysis, and a Quality Control Plan.
We post new exterior maintenance opportunities in Massachusetts as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"01742-2751""CONCORD""MA""USA""KO CONTRACTING DIVISION""696 VIRGINIA ROAD""Amendment W912WJ26QA167-0004.pdf"3994501"file"".pdf""1""2026-10-09T11:25:50.942+00:00""e52cbdca5def4ce8a067be0f0269988b""public""0""public""9fc647ccef164c1a87bc80b48d8a8b8e""0"7"0""Amendment W912WJ26QA167-0003.pdf"3975559"file"".pdf""1""2026-10-06T17:14:06.427+00:00""8cb0fc717262404b8222b7d7de16b11f""public""0""public""50c9500aedb04401b0ded9242898523a""0"6"0""Amendment W912WJ26QA167-0002.pdf"3979534"file"".pdf""1""2026-10-01T16:53:18.703+00:00""0a4cd27a7a3345959b9fcad3513a6b27""public""0""public""810ddad8c57049888b1ce84ab5649591""0"5"0""Attachments 26QA167.pdf"1598874"file"".pdf""1""2026-09-29T12:38:15.611+00:00""393dccf93fe343438b77bf9e19ae94ea""public""0""public""6369d20598d14b63b793768d1d693c02""0"4"0""Amendment W912WJ26QA167-0001.pdf"3991374"file"".pdf""1""2026-09-29T12:38:15.611+00:00""62af54274f724e1484b6f38979cf051a""public""0""public""a7b46569b3764230b8671d2cf0f0614e""0"3"0""Solicitation W912WJ26QA167.pdf"3325575"file"".pdf""1""2026-09-29T12:38:15.611+00:00""c64a35600de8435ab4ee364786fb87d7""public""0""public""a507d5f12d7b4cf78459753ca1160c6e""0"2"0""Solicitation Survey 26QA167.pdf"353941"file"".pdf""1""2026-09-29T12:38:15.611+00:00""74f330eb67294ef2b2e3ab48fee74e1e""public""0""public""f4af04e7acaf4dc5abba00e3b230ae6f""0"1"0"Most Massachusetts work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 3a447c5fbd4c41d08dd67315e58ac491), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.