We post new waste management opportunities in Washington, DC as agencies publish them. Get them in one email — free, and unsubscribe whenever.
This is a presolicitation notice for a competitive solicitation that GPO intends to post on or about July 17th, 2026. The scope of work includes:
The United States Government Publishing Office (GPO) is constantly under renovation due to office moves, production improvements, infrastructure modifications, and facility maintenance. As a result, GPO requires on-call and scheduled removal of non-hazardous debris, recyclable scrap metal, and paper dust. GPO’s Plant Operations Division requires two (2) 40-yard roll-off dumpsters and one (1) 30-yard recyclable metal roll-off dumpster. The Contractor shall furnish all labor, equipment, roll-off dumpsters, transportation, permits, and disposal services necessary to provide on-call removal, transportation, recycling, and disposal of non-hazardous debris, and recyclable scrap metal generated by GPO.
The United States Government Publishing Office has 3 shifts in the building, and it is imperative that the trash be removed for the health and safety for all the employees at GPO. As a result, GPO requires the trash compacter be exchanged every Tuesday and Friday. This statement of work covers the trash compacter exchange for the trash collected for GPO’s Building A, B, C and D.
A site visit will be scheduled for Tuesday, July 28th, 2026 10:30-11:30AM EST.
The contractor shall furnish all labor, equipment, roll-off dumpsters, transportation, permits, and disposal services necessary to provide on-call removal, transportation, recycling, and disposal of non-hazardous debris and recyclable scrap metal generated by GPO. The contractor shall provide two (2) 40-yard roll-off dumpsters located in Lot 50 at the rear of Building B Garage on an on-call basis with a response time not to exceed 24 hours, and one (1) 30-yard recyclable metal roll-off dumpster also on an on-call basis. Additionally, the contractor shall provide one 30-yard roll away dumpster with a trash compacter located in Lot 50 at rear of Building C, exchanged every Tuesday and Friday. Revenue from recycled scrap metal shall be remitted to GPO, and the contractor shall provide certified weight tickets and monthly accounting.
Source: SAM.gov (notice 38d1816ee524447585b6d21fda2f2743), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.