We post new general contractors opportunities in Montana as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Amendment 4: Additional Q&As - Offers Due Date Pryor Clinic Expansion Construction
The purpose of this amendment is to post additional questions and answers (Q&As).
The Q&As are updated and attached below.
The offers due date is extended to 08/18/2026.
All other terms and conditions remain unchanged.
Amendment 3: Sole Source Justification for Controls Pryor Clinic Expansion Construction
The purpose of this amendment is to post a sole source justification for a portion of the requirements.
This sole source justification is only for the fire alarm system products and maintenance services portion of the construction
project currently under solicitation.
Automated Logic is the sole source provider for the fire alarm system products and maintenance services.
All other terms and conditions remain unchanged.
Amendment 2: Site Visit Pryor Clinic Expansion Construction
The purpose of this amendment is to post the site visit sign-in sheet and the preproposal conference minutes.
The following attachments are posted:
B03 Pre-Proposal Conference Pryor Clinic Expansion Construction
B03 Sign-In Sheet Site Visit Pryor Clinic Expansion Construction
Amendment 1: Pryor Clinic Expansion Construction
a. Extend the offers due date.
b. Update clauses and provisions.
c. Post the questions and answers received in response to this solicitation.
d. Add the geotech report.
The offers due date is extended to 08/04/2026.
The following clauses and provisions are updated:
a. Removed 52.225-9, Buy American—Construction Materials.
b. Added 52.225-11 Buy American-Construction Materials under Trade Agreements
(Deviation Mar 2026), Alt I (Mar 2026).
c. Added 52.225-12 Notice of Buy American Requirement-Construction Materials Under
Trade Agreements (May 2014), Alternate I (May 2014), Alternate II (Nov 2023).
d. Added 52.228-1 Bid Guarantee (Sept 1996).
e. Clause 52.225-11 and provisions 52.225-12 and 52.228-1 Bid Guarantee are included at
the end of the "B05 Amendment 1 Pryor Clinic Expansion Construction" document.
attachment.
Attachment “J03a Georeport Pryor Clinic Expansion Construction” is added.
All other terms and conditions remain unchanged.
Solicitation: Pryor Clinic Expansion Construction
Solicitation Number: 75H70126R00024
Set-Aside: ISBEE set-aside.
Evaluation Method: Tradeoff
Product Service Code: Y1DA, Construction of Hospitals and Infirmaries
NAICS Code: 236220, Commercial and Institutional Building Construction with a size standard of $45M
Location: 2 Pryor Gap Rd, Pryor, MT 59066 County: Big Horn
POP: 365 calendar days
Construction Magnitude: Between $5,000,000 and $10,000,000
Contract Type: firm-fixed-priced
TERO: TERO is applicable. See Section H.50.
Goal: The purpose of this project is to provide construction services to renovate the Pryor Clinic in Pryor, Montana. The project will renovate approximately 8,655 square feet of existing space in the Pryor Clinic.
Contact Information:
Primary Point of Contact:
Daniel Cotto
Email: daniel.cotto@ihs.gov
Phone Number: 240-461-7841
Alternative Point of Contact (please only contact if the primary is not available):
Andrew E. Hart
Email: andrew.hart@ihs.gov
Phone Number: 206-375-4443
Attachments: Refer to the attachments section.
The project includes renovation of approximately 8,655 square feet of existing space and construction of a new 2,700 (+/-) square foot addition to the existing health center. Work includes demolition, construction of a new elevator pit with micropiles, installation of a new hydraulic elevator, replacement of the fire alarm system with a new standalone system including approximately 90 devices, installation of UL752 Level 3 bullet resistant walls and windows, application of 1-hour fire rated intumescent coating at exposed wood ceilings in mechanical rooms, repainting of all exterior EIFS surfaces, painting of new galvanized guardrails/handrails and exterior exposed wood, and associated mechanical, electrical, plumbing, and finish work. The health center must remain operational at all times throughout construction, requiring a detailed phasing plan.
"20201""Washington""DC""US""Hubert H. Humphrey Building 200 Independence Avenue, SW ""20852""Rockville""MD""US""The Reyes Building 801Thompson Avenue, Suite 400""98121""SEATTLE""WA""USA""2201 6TH AVENUE""MAIL STOP RX-24""B05 Amendment 4 Additional QAs - Offers Due Pryor Clinic Expansion Construction.pdf"1239786"file"".pdf""1""2026-08-03T19:42:17.38+00:00""36a7a55404f54615b7ed3a47b42a2b2d""public""0""public""f7aef675fac0425dad07ab40024867f9""0"18"0""A08 SSJ PCEC AH.pdf"355207"file"".pdf""1""2026-07-23T20:41:37.991+00:00""490c6ffabcd649b49faab10e8f9cd613""public""0""public""53a2d3f7e8b342188543448ef0523c7e""0"17"0""B05 Amendment 3 SS Controls Pryor Clinic Expansion Construction.pdf"281956"file"".pdf""1""2026-07-23T20:41:37.991+00:00""27b63890eb1f466e84c5ad27d4ad1ea0""public""0""public""f7235820e320415ebc97bda37ff0c646""0"16"0""B03 Sign-In Sheet Site Visit Pryor Clinic Expansion Construction.pdf"123029"file"".pdf""1""2026-07-15T16:48:09.324+00:00""71b017cec13340c8a17a3ca14c0fac85""public""0""public""a4d8afcb3dcb4b68a3f8506f47b563f4""0"15"0""B03 Pre-Proposal Conference Pryor Clinic Expansion Construction.pdf"69286"file"".pdf""1""2026-07-15T16:48:09.324+00:00""ae591c98160f40ceb7ab91cfc5de6fab""public""0""public""2cd6eb54c2d942eab3bc833d8d634f77""0"14"0""B05 Amendment 2 Site Visit Pryor Clinic Expansion Construction.pdf"130649"file"".pdf""1""2026-07-15T16:48:09.324+00:00""c07e60b15f934b54a6735030e795dda8""public""0""public""7e1fce7df3e44dc391fb28ec19275fa5""0"13"0""Q andAs Pryor Clinic Expansion Construction.pdf"273803"file"".pdf""1""2026-07-13T22:51:52.321+00:00""ae183e9244ab438695f73ea52d5acb8d""public""0""public""6d3849fbcf114cdd890e8423a39d1acc""0"12"0""J03a Georeport Pryor Clinic Expansion Construction.pdf"3999024"file"".pdf""1""2026-07-13T22:51:52.321+00:00""121a740aad114af5bedf9425a8aa3802""public""0""public""24fb353f43064d1ca48039735637b08c""0"11"0""B05 Amendment 1 Pryor Clinic Expansion Construction.pdf"366677"file"".pdf""1""2026-07-13T22:51:52.321+00:00""44a4ef1df3b14ef9a3176943c9a2d9a7""public""0""public""59491d3d9cc24120bee69054892a4606""0"10"0""J02 Drawings Pryor Clinic Constr.pdf"90551625"file"".pdf""1""2026-06-16T20:46:31.511+00:00""ab317d2261b84679b608afe7ec29ecbc""public""0""public""060eb99640f24b5c81d1b928ca3f8431""0"9"0""J03 Specs Pryor Clinic Constr.pdf"10726006"file"".pdf""1""2026-06-16T20:46:31.511+00:00""268145942c9940b7b432cbaece069fa0""public""0""public""d9d4e62307d44e5996e921931081a9f3""0"8"0""B01 RFP 26R00024 Pryor Clinic Construction.pdf"729556"file"".pdf""1""2026-06-16T20:46:31.511+00:00""25db178a7dd94bdbbe88d334af2d02ff""public""0""public""900b56d78625481490b5887f725b20cb""0"7"0""J08 WH 347 Payroll Exp 30Sep2026.pdf"187233"file"".pdf""1""2026-06-16T20:46:31.511+00:00""b6d1ccebd74645498c88e1f45d7b5e36""public""0""public""3fd6de2002cc4f418f078fcbbf11e1e0""0"6"0""J06 IHS IEE Representation Form Pryor Clinic Constr.pdf"138486"file"".pdf""1""2026-06-16T20:46:31.511+00:00""4ab446dc6ec844379c143688d8079415""public""0""public""e542c5b9e4df401c9c3a2deb3aa6bd81""0"5"0""J01 SOW Pryor Clinic Constr.pdf"124717"file"".pdf""1""2026-06-16T20:46:31.511+00:00""f54034647af042a3938180c4dc1cf382""public""0""public""7606116827004e17b6460d9f4428b14c""0"4"0""J04 Wage Det MT20260056 18May2026 Pryor Clinic Constr.pdf"66208"file"".pdf""1""2026-06-16T20:46:31.511+00:00""ef6c85b10db14457a3f3e403aafd6086""public""0""public""fb8fb7da706c4373a45efc3d9a4bffe3""0"3"0""J99 Optional Form PPQ.docx"32493"file"".docx""1""2026-06-16T20:46:31.511+00:00""a2b841cb73f041be88756270de55b489""public""0""public""f69e9c9cb045445c9266ac9bd1576152""0"2"0""J07 Release of Claims Pryor Clinic Constr.docx"14326"file"".docx""1""2026-06-16T20:46:31.511+00:00""358c0fa19b1a46149905bb8ce7446336""public""0""public""5e992a5091604f52a2b309fcb2608521""0"2"0""J05 Self Performed Calculation Sheet Pryor Clinic Constr.docx"28743"file"".docx""1""2026-06-16T20:46:31.511+00:00""5216f9c842954a4a85942cbe38f61f56""public""0""public""dbdec7ee65754dc4b463dc63db476b65""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice 370e9816a23f4fa680e16fab258662a4), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.