We post new waste management opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Argonne National Laboratory is seeking a service provider to process, load, haul, and recycle or dispose of excess material and equipment. Please refer to the Statement of Work (APPENDIX B), attached, for further details.
If able to provide the items listed above, please submit your firm, fixed price proposal addressing the following requirements by August 27, 2026 at 3:00 PM CST.
Offerors are required to visit the site and assess all relevant conditions that may impact the work outlined in this Contract. Bidders must ensure their proposals encompass all necessary incidental items to fulfill the work specified or depicted in the contract documents. Site visits will be scheduled from August 12, 2026, to August 18, 2026. To arrange a site visit, please coordinate with jmangis@anl.gov
if you intend to submit an offer.
For any questions, please contact jmangis@anl.gov, no later than August 20, 2026, at 3:00 PM CST.
Applicable Documentation:
ANL-70 Request for Quotation 6-B187-Q-00373-00, RFQ, dated August 7, 2026. Complete and Return
Appendix “A” Argonne Terms and Conditions for Commercial Items, ANL-71COM, dated October 22, 2025. Review and Accept
Appendix “B” Argonne Statement of Work, SOW, dated August 4, 2026. Review
High Risk On-Site Supplemental Conditions, ANL-366H, dated October 1, 2024. Review and Accept
High-Risk Job Safety Analysis (JSA), ANL-209H, dated August 7, 2024. Review
Pre-Award Information, Representations and Certifications, ANL-70A, dated March 26, 2025. Complete and Return
SCA Wage Flyer, dated April 2009. Review
Wage Determination, 2015-5017, Revision 32, dated May 13, 2026. Review
Provide the following with your quotation:
Signed Page one of the RFQ (ANL-70).
Confirm earliest date that work can commence.
Completed Representations and Certifications (ANL-70A).
Certificate of Insurance.
Are there any available discounts for DOE or does this order fall under GSA contract pricing (if yes, please include contract # and expiration date)?
Proposal will be considered incomplete if any of the requested information, listed above, is not provided.
The contractor shall furnish all labor, equipment, materials, supplies, transportation, qualified supervision, and any other items necessary to complete the work described. The work includes demolition of man-made structures by conventional means, removal of excess equipment and materials designated by Argonne personnel, waste segregation, hauling, and disposal of waste in compliance with Local, State, and Federal regulations. The contractor is responsible for implementing work in compliance with an approved health and safety program, Job Safety Analysis, engineering demolition survey, and Laboratory Integrated Safety Management System. All non-regulated trash, scrap materials, and other contractor generated debris shall be removed from the site. Recoverable metal will be segregated and transported to a metal recycling facility. The work is targeting removal of man-made structures associated with former site operations and is not intended to include soil removal action that might be considered site remediation.
"Richland""WA""US""2345 Stevens Drive""60439""Lemont""IL""USA""9700 S. Cass Ave""ANL-70 Request for Quotation 6-B187-Q-00373-00.pdf"248824"file"".pdf""1""2026-08-07T18:45:25.106+00:00""dc7a668b48b54b1a9f87c72026d1d92c""public""0""public""d9db5f0e2dcf427fb41e78246c1582d3""0"8"0""Appendix A-71COM-22-OCT-2025.pdf"1083213"file"".pdf""1""2026-08-07T18:45:25.106+00:00""a3f288b30c0c4d6a853a23deab4af81a""public""0""public""5633540c8f3a488caaf03c1d8df6e3dc""0"7"0""Appendix B-SOW_800 Area Cleanup Project 08-04-26.pdf"6374972"file"".pdf""1""2026-08-07T18:45:25.106+00:00""f86d0973428b467dbb35c575c21165ce""public""0""public""802a2114fff846008e5b5c8af502811b""0"6"0""ANL-366H (On-Site High Risk)-01-OCT-2024.pdf"322357"file"".pdf""1""2026-08-07T18:45:25.106+00:00""7c4242ac8d174d8a95d96a27e5fa2302""public""0""public""d887e6fe08d44d81950943c5c7c41b83""0"5"0""ANL-209H JSA_6-B187-Q-00373-00.pdf"826674"file"".pdf""1""2026-08-07T18:45:25.106+00:00""4e40ebf5febf4e67b4211eb2e3c5f76f""public""0""public""27ecdc2b30374d2092725baa126bf41f""0"4"0""ANL-70A Reps and Certs Short-26-MAR-2025.pdf"432794"file"".pdf""1""2026-08-07T18:45:25.106+00:00""06a3b5882a4f4f828b757ec2fed8c99b""public""0""public""ec7df51b96474626a848d45168825df0""0"3"0""DuPage County Wage Determination.pdf"76091"file"".pdf""1""2026-08-07T18:45:25.106+00:00""9cac36ea75a8471781e9ff531f99921b""public""0""public""9f86251158ab472ca31415dda565893f""0"2"0""SCA Wage Flyer 2009.pdf"126412"file"".pdf""1""2026-08-07T18:45:25.106+00:00""afb2182b1c6d4af9884942dd0a0b46d5""public""0""public""b8f397ceddd24a3f9948f9f4342b9c43""0"1"0"Source: SAM.gov (notice 304a34074da9417a90047cb182b2a103), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.