Requirements:
The Laboratory of Neurogenetics conducts genetic analyses of DNA samples to determine the genetic contribution to various mental health conditions including alcohol use disorders. One method of DNA analysis uses array chips to interrogate multiple SNPs at the same time. The array chips are most efficiently processed using a Tecan LiHa robot. The purpose of this contract is to obtain preventative maintenance and emergency repair service when needed for the Tecan LiHa robot system.
Provide 1 preventative maintenance visit (arranged with Laboratory personnel at a time convenient to both) to ensure that the LiHa robot is working properly. The company will provide the following on an as needed basis:
Full coverage for parts, labor and travel for unexpected breakdowns of the LiHa system giving assurance against unexpected costly repairs. The company will have an onsite response time of 2 business days (on average)
The company will all replace reagents that were rendered useless due to hardware failures of the LiHa system.
Hardware and software updates to the LiHA system will be provided at no additional cost.
LiHa systems users will have access to remote technical support, on-site applications support and discounts on advanced training as needed.
The contractor must provide one preventative maintenance visit per year, arranged with laboratory personnel, to ensure the LiHa robot is working properly. On an as-needed basis, the contractor must provide full coverage for parts, labor, and travel for unexpected breakdowns with an onsite response time of 2 business days on average; replace reagents rendered useless due to hardware failures; provide hardware and software updates at no additional cost; and provide remote technical support, on-site applications support, and discounts on advanced training.
We post new equipment maintenance & rental opportunities in Maryland as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"20201""Washington""DC""US""Hubert H. Humphrey Building 200 Independence Avenue, SW ""20892""Bethesda""MD""US""3100 Center Drive Room 1B59""20892""BETHESDA""MD""USA""6011 EXECUTIVE BLVD., SUITE 503L""Requirement 47.docx"16209"file"".docx""1""2026-10-09T21:49:51.162+00:00""3966d9ae5744439e94f30c416016429c""public""0""public""08a1d127fa7f4271b61a3254124123a1""0"1"0"Most Maryland work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 2a1f6966f0174161876e334d6a0942db), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.