On September 30, 2026, amendment 0003 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:
This amendment must be acknowledged and submitted with your quote.
On September 17, 2026, amendment 0002 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:
Post RFI questions and answers labeled C05a RFI QA 1240BH26R0013.
Post pre-bid sign in sheet labeled C05b Site Visit Sign In 1240BH26R0013.
This amendment must be acknowledged and submitted with your proposal.
On August 12, 2026, amendment 0001 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:
This SF30 must be acknowledged and submitted with your proposal.
This project includes all labor, equipment, supplies, testing & inspections, and incidentals necessary for the Blanchard Springs Caverns (BSC) Dripstone and Discovery Trail Infrastructure repairs and safety upgrades. All work shall conform to the attached Drawings and Specifications. All work shall be performed by qualified and licensed contractors for all trades applicable. Work includes but is not limited to structural stabilization of tunnel entrance and exits, disposal and removal of existing supports, masonry repairs, Installation of Instrumentation & monitoring equipment, replacement of existing air lock doors at entrance and exits, replacement of existing security doors at entrance and exits, replacement of existing suspended ceiling system, components, and associated ductwork, replacement of existing bypass tunnel door, replacement of existing lighting and distribution system components, replacement of existing safety handrails, and replacement of the existing mine phone system and components.
The project provides all labor, equipment, supplies, testing and inspections for Blanchard Springs Caverns Dripstone and Discovery Trail infrastructure repairs and safety upgrades conforming to drawings and specifications, including structural stabilization of tunnel entrances and exits, removal of existing supports, masonry repairs, rockbolts, mesh and shotcrete, instrumentation and monitoring, replacement of airlock doors, security doors and bypass tunnel door, suspended ceiling systems with ductwork, lighting and distribution, safety handrails, mine phone system, sinkhole fill with crushed limestone, diversion berm, and seeding.
We post new other opportunities in Arkansas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""US""20250""WASHINGTON""DC""USA""PROCUREMENT & PROPERTY SERVICES""1400 INDEPENDENCE AVE SW, MS-1138""C05 SF30 1240BH26R0013-0003.pdf"86776"file"".pdf""1""2026-09-30T16:36:59.46+00:00""3b4ffb4cca6b460f8650456698659827""public""0""public""86a56ab470fe448da7d1d6c93b0a3f43""0"18"0""C05b Site Visit 1240BH26R0013.pdf"1529961"file"".pdf""1""2026-09-17T16:19:34.874+00:00""74873350472f421484543ac665ca3c1d""public""0""public""2af8204637a349c6ad2c99a98a879332""0"17"0""C05 F30 1240BH26R0013-0002.pdf"106757"file"".pdf""1""2026-09-17T16:19:34.874+00:00""7f7c3a1170954a3985f0d50bf9c41a9a""public""0""public""e9d2def44651479fb41dee83c6640b4f""0"16"0""C05a RFI QA 1240BH26R0013.docx"29440"file"".docx""1""2026-09-17T16:19:34.874+00:00""2d6c3ca1fdea49a0809d0a1094bf13fe""public""0""public""c405cfbdfeb041ca8aa11cab2ad46e24""0"15"0""C05m Attachment 11 Golder 1240BH26R0013.pdf"1003643"file"".pdf""1""2026-08-12T15:14:24.67+00:00""4c746a0cea5e4cc882ff99e01e80f00d""public""0""public""6f8d7b934ab34e538ce52f0aae43bf3d""0"14"0""C05 SF30 1240BH26R0013-0001.pdf"86410"file"".pdf""1""2026-08-12T15:14:24.67+00:00""b5659242f7d14b84abeed0a4fd15e2a7""public""0""public""79d8a8b7150a4888b0c113183db8d1eb""0"13"0""C04 SF1442 1240BH26R0013.pdf"328784"file"".pdf""1""2026-08-04T18:42:56.664+00:00""bb3bd3bd7f794d6ab96aff25e906fd8a""public""0""public""8d186bfff73246e89b2da993200c5d52""0"12"0""C04b Attachment 2 Specs BSC LH 1240BH26R0013.pdf"1243387"file"".pdf""1""2026-08-04T18:42:56.664+00:00""87c897a262c6421b8c51524b7c49c541""public""0""public""756e57b0b16c40de87a8d06fa1273ebc""0"11"0""C04d Attachment 4 Dwgs BSC Handrails 1240BH26R0013.pdf"90054670"file"".pdf""1""2026-08-04T18:42:56.664+00:00""d1282a898837495f80a0800b7f6e7624""public""0""public""36dbaafaa4c8406196e597d735ef468d""0"10"0""C04e Attachment 5 Env Assessment 1240BH26R0013.pdf"8226199"file"".pdf""1""2026-08-04T18:42:56.664+00:00""bf29e03631b44c8986dab4319562d7a1""public""0""public""69e39ad40fae4baa8714ced833e42f2b""0"9"0""C04g Attachment 7 Recommendations1240BH26R0013.pdf"4116026"file"".pdf""1""2026-08-04T18:42:56.664+00:00""6092d5a8480f49f7babd95e80716181f""public""0""public""341d384389c3481c8703f9fde44d043e""0"8"0""C04c Attachment 3 Drawings BSC 1240BH26R0013.pdf"4077991"file"".pdf""1""2026-08-04T18:42:56.664+00:00""4d9ed47ec31a4afaa578214f5fcb9a89""public""0""public""850adf9c1b0345a3bf807d0c27d5f30a""0"7"0""C04k Attachment 11 General Decisio AR20260022 05182026.pdf"1556262"file"".pdf""1""2026-08-04T18:42:56.664+00:00""68ee0f297dc24e5cbff85ed8842a1c3d""public""0""public""b41d4629dff34a2a8e258d4db5ade2bc""0"6"0""C04i Attachment 9 Site Visit 1240BH26R0013.docx"127981"file"".docx""1""2026-08-04T18:42:56.664+00:00""a573e9913f654efc8d36dd7594f51b82""public""0""public""f6a08916b0a34c519ab8577f78a43b9f""0"5"0""C04a Attachment 1 SOW BSC 1240BH26R0013.docx"74455"file"".docx""1""2026-08-04T18:42:56.664+00:00""8a0eba4d13b34b8f9772a6b405ece405""public""0""public""e1e43a17d55a4b6097d5a6f18a38f4c5""0"4"0""C04h Attachment 8 Estim Quant 1240BH26R0013.xlsx"34192"file"".xlsx""1""2026-08-04T18:42:56.664+00:00""33e48b039b1e42dc929b36f12c81fa98""public""0""public""53e9918d6d6448dfb70c25a09a8d8633""0"3"0""C04j Attachment 10 RFI Form 1240BH26R0013.docx"30162"file"".docx""1""2026-08-04T18:42:56.664+00:00""a44be4b03fc84e1cbd6e4e39b279d2ac""public""0""public""1849bb640c6f40ec996f3ad780ec4555""0"2"0""C04f Attachment 6 SOI 1240BH26R0013.xlsx"13608"file"".xlsx""1""2026-08-04T18:42:56.664+00:00""7418440fd80a47d69c8586abb6f16c5c""public""0""public""6e51494231bc48cf9544ef79fd828cd6""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 127aae2650554548a323d140be3baf06), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.