PLEASE INCLUDE THE FOLLOWING IN YOUR BID:
• CAGE/UEI CODE
• FOB DESTINATION
• LEAD TIME FOR DELIVERY
• POC NAME & EMAIL
Questions must be sent no later than day 3 of the posting.
** SEE THE ATTACHMENTS **
We will not be paying with a credit card
VENDORS MUST REFERENCE THE RFQ NOTICE ID NUMBER IN THE SUBJECT LINE OF YOUR EMAIL WHEN SUBMITTING A QUOTE
The contractor must supply a dome-loaded pressure regulator with 4-inch Grayloc 4GR31 hubs, a MAWP of 6,000 PSIG minimum, flow capacity up to 80 lbm/sec GN2, and a minimum Cv of 80. The regulator must be suitable for gaseous nitrogen and helium service, with stainless steel or equivalent corrosion-resistant body and wetted parts. Delivery is required within 24 weeks ARO to Bldg. 2204, NASA Stennis Space Center, MS. The contractor must provide material certifications, hydrostatic/pressure test reports, dimensional drawings, and technical data sheets.
We post new goods & materials opportunities in Mississippi as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""39529""STENNIS SPACE CENTER""MS""USA""JERRY HLASS ROAD, BLDG. 1111""SATPC0042859 Tab 10 4 Questions.pdf"239226"file"".pdf""1""2026-10-08T13:04:30.75+00:00""61e87e9b61174c269ae3b8ada24b0b31""public""0""public""83895a88cb0d4c0596eecab9ee22a290""0"4"0""SATPC0042859 Tab 10 4 Questions.pdf"122801"file"".pdf""1""2026-10-07T15:06:44.338+00:00""d883431242044d7a9681721738f4a3a0""public""2026-10-08T13:04:30.75+00:00""1""public""78c09e32eeda43789858e603456296af""0"3"0""2026-10-08T13:04:30.75+00:00""SATPC0042859 Tab 10 1 RFQ.pdf"370184"file"".pdf""1""2026-10-06T19:18:30.863+00:00""afc1b6fb9ac946df829f5a79c1cde8f5""public""0""public""064d37b662de41cfa667481d533e7f9e""0"2"0""SATPC0042859 Tab 04 4 SOW.pdf"279402"file"".pdf""1""2026-10-06T19:18:30.863+00:00""5dafc409653c4d1a88bee7bc562a2719""public""0""public""7f08e84d7acb4303a0d8410696305523""0"1"0"Most Mississippi work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 0dd733e608244113a01412f1dbaf5c94), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.