We post new goods & materials opportunities in South Carolina as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Contractor will be responsible for Carpet Replacement and applicable transitions in B1947,to include removal of existing carpet, existing cove base, existing transitions, and installing modular carpet squares (approximately 20,000 sq ft), applying vinyl cove base(approximately 2,500 linear feet) IAW Statement of Work
SITE VISIT WILL TAKE PLACE 11 August 2026 @ 2:00 PM EST MEETING LOCATION WILL BE REAR OF BUILDING 1947, NEAR THE LOADING DOCK
Please see attached instructions and template to request base access. All base access request must be recieved by the Contract Specialist (TSgt Allan Zajac allan.zajac@us.af.mil) no later than August 6 at 1400 EST.
The contractor shall furnish all labor, tools, materials, permits, and equipment to remove existing carpet, cove base, and transitions; install modular carpet squares (approximately 20,000 sq ft) and vinyl cove base (approximately 2,500 linear feet); disassemble, remove, and reassemble existing furniture; prepare floor surfaces; and haul away and dispose of removed materials. Carpet and adhesive must be purchased from one of seven predetermined government sources. The contractor shall provide at least a five-year warranty against fraying, unraveling, separating, buckling, and on workmanship.
"29152-5125""SHAW AFB""SC""USA""CP 803 895 5403""321 CULLEN ST BLDG 216""Attch 01-SOW B1947 Carpet Replacement 11Jun26.pdf"147883"file"".pdf""1""2026-08-05T13:21:09.602+00:00""0b1438402ef7455e82299c8881df77a5""public""0""public""cf556ad34f0b4ddb932b5dd80aa323fb""0"5"0""Solicitation - FA480326Q0088.pdf"599135"file"".pdf""1""2026-07-31T19:07:12.926+00:00""76baaac9f84c4ae98e3ec90850c89899""public""0""public""bb666ba207744b07b15eb599463b4dc9""0"4"0""1. (2026) BLANK WITH EXAMPLE Shaw AFB Contractor Request Template (WORK PURPOSES).docx"188273"file"".docx""1""2026-07-31T19:07:12.926+00:00""6b85939000574b7f9cb66041cad8df5b""public""0""public""7bf6dddbc32340889b4d5802e74bcca1""0"3"0""1947 SECOND FLOOR PLAN.pdf"750114"file"".pdf""1""2026-07-31T19:07:12.926+00:00""80896298fa9f4be1808e2c01d52fee1d""public""0""public""8762989206d54522b1e603057981039c""0"2"0""SOW B1947 Carpet Replacement 11Jun26.pdf"266006"file"".pdf""1""2026-07-31T19:07:12.926+00:00""82b5dc03b5084001943ef70cea999f2f""public""2026-08-05T13:21:09.602+00:00""1""public""269672943c524da98ccdfab38b25e318""0"1"0"Source: SAM.gov (notice 029b47f37760459780083bb3b7ecdaf0), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.